Install EV Chargers in Tigard, Oregon

Install EV chargers or analyze a site in Tigard, Oregon. 32 existing public charging locations (7 DC fast, 25 Level 2). Free 0–100 profitability score on any Tigard address from EV Data Map by Charge Rigs.

Tigard, Oregon is served by 32 public electric vehicle charging locations operating 104 individual chargers — an average of 3.3 chargers per site. Of those locations, 7 (22%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (78%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tigard is ChargePoint Network with 13 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 175 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tigard and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tigard

Tigard, Oregon, boasts a notably competitive public EV charging landscape, featuring 32 locations across seven distinct operators, with ChargePoint Network leading at 41%. This diversity enhances pricing and uptime while inviting a more nuanced site selection for drivers who prioritize power and amenities. The city’s seven DC fast chargers average an impressive 175 kW, with 43% of these stations classified at 150 kW or higher, catering to a range of charging needs. With the fastest stall reaching 350 kW, Tigard positions itself well for both current and emerging EV technologies, balancing high-power options alongside 25 Level 2 chargers to serve longer-dwell demand, making it an attractive hub for EV drivers navigating the greater Portland area.

Tigard charging by the numbers

Locations
32
Chargers
104
DC Fast locations
7
Level 2 locations
25

DC fast share: 22% of locations. Level 2 share: 78%. Average chargers per site: 3.3. Average DC fast power: 175 kW.

Tigard charging — local snapshot

Top operator share
ChargePoint Network runs 41% of public locations across 7 networks.
Average DC fast power
175 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
22% DC fast / 78% Level 2 across 32 locations
Estimated DC ports
25 fast-charging ports city-wide

Charging networks in Tigard

The following operators run public charging in Tigard, ranked by number of locations.

Featured charging locations in Tigard

A selection of higher-power public charging locations across Tigard, sorted by power level.

  1. Walmart 5935 (Tigard, OR) — Tigard, OR, 97223 (Electrify America · DC Fast · 350 kW)
  2. Tigard, OR — Tigard, OR, 97224 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Landmark Ford - PHI-DCFC — Tigard, OR, 97223 (Blink Network · DC Fast · 180 kW)
  4. PGE LINCOLN DCFC 1 — Tigard, OR, 97223 (ChargePoint Network · DC Fast · 125 kW)
  5. PGE LINCOLN DCFC 2 — Tigard, OR, 97223 (ChargePoint Network · DC Fast · 125 kW)
  6. Landmark Ford - CTX DCFC — Tigard, OR, 97223 (Blink Network · DC Fast · 120 kW)
  7. PARADISE H-D DCFAST HOG — Tigard, OR, 97223 (ChargePoint Network · DC Fast · 24 kW)
  8. Landmark Ford - 12000 — Tigard, OR, 97223 (Blink Network · Level 2 · 21.6 kW)
  9. COURTYARD M T CHARLIE — Tigard, OR, 97224 (ChargePoint Network · Level 2 · 19.2 kW)
  10. Rutkin Elementary School — Tigard, OR, 97224 (Blink Network · Level 2 · 16.6 kW)
  11. Tigard Public Library — Tigard, OR, 97223 (OpConnect · Level 2 · 11.5 kW)
  12. 12505 SW North Dakota — Tigard, OR, 97223 (AUTEL · Level 2 · 11.5 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tigard specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tigard, Oregon?
There are 32 public electric vehicle charging locations in Tigard, Oregon, with a combined 104 individual chargers. 7 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Tigard?
ChargePoint Network operates the most public charging locations in Tigard with 13 sites, followed by Blink Network with 11 sites.
How much does it cost to install an EV charger in Tigard?
Level 2 EV chargers in Tigard typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tigard?
Most Tigard projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tigard?
A typical commercial Level 2 installation in Tigard energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tigard take to become profitable?
Payback in Tigard depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.