Install EV chargers or analyze a site in Monroeville, Pennsylvania. 33 existing public charging locations (11 DC fast, 22 Level 2). Free 0–100 profitability score on any Monroeville address from EV Data Map by Charge Rigs.
Monroeville, Pennsylvania is served by 33 public electric vehicle charging locations operating 71 individual chargers — an average of 2.2 chargers per site. Of those locations, 11 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 22 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Monroeville is ChargePoint Network with 25 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 116 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Monroeville and receive an instant ROI score, demand projection, and recommended charger configuration.
Monroeville, Pennsylvania’s charging landscape stands out due to its significant reliance on the ChargePoint Network, which operates 76% of the 33 public charging locations, ensuring consistency and reliability for EV drivers. The 11 DC fast charging stations boast an impressive average output of 116 kW, with 18% of these sites offering power levels of 150 kW or higher, placing new charging ventures in a competitive position at the top of the local power spectrum. With 33% of the city’s chargers categorized as DC fast, operators can strategically target urban dwellers who prioritize quick charging alongside the 22 Level 2 options for longer stays. This unique infrastructure mix emphasizes the importance of assessing demand gaps and harnessing optimal power capabilities in site planning.
DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.2. Average DC fast power: 116 kW.
The following operators run public charging in Monroeville, ranked by number of locations.
A selection of higher-power public charging locations across Monroeville, sorted by power level.
Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Monroeville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 22 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.