Install EV chargers or analyze a site in Wexford, Pennsylvania. 15 existing public charging locations (8 DC fast, 7 Level 2). Free 0–100 profitability score on any Wexford address from EV Data Map by Charge Rigs.
Wexford, Pennsylvania is served by 15 public electric vehicle charging locations operating 26 individual chargers — an average of 1.7 chargers per site. Of those locations, 8 (53%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (47%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Wexford is ChargePoint Network with 10 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 68 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wexford and receive an instant ROI score, demand projection, and recommended charger configuration.
Wexford, Pennsylvania, offers a unique landscape for EV charging, with 15 public stations—8 of which are DC fast chargers, making up over half of the city's charging infrastructure. Dominated by ChargePoint Network, which controls 67% of these locations, operators must consider the implications of limited competition on pricing and reliability. The average DC fast charging power of 68 kW, with a peak at 120 kW, reflects an aging fleet. This creates an opportunity for new entrants to provide higher-capacity options, particularly in a market where driver preferences are shifting toward faster charging solutions. Wexford's mix of fast and Level 2 chargers, alongside its nearby urban centers, highlights the potential for strategic site development to meet growing demand.
DC fast share: 53% of locations. Level 2 share: 47%. Average chargers per site: 1.7. Average DC fast power: 68 kW.
The following operators run public charging in Wexford, ranked by number of locations.
A selection of higher-power public charging locations across Wexford, sorted by power level.
Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Wexford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.