Install EV Chargers in Wexford, Pennsylvania

Install EV chargers or analyze a site in Wexford, Pennsylvania. 15 existing public charging locations (8 DC fast, 7 Level 2). Free 0–100 profitability score on any Wexford address from EV Data Map by Charge Rigs.

Wexford, Pennsylvania is served by 15 public electric vehicle charging locations operating 26 individual chargers — an average of 1.7 chargers per site. Of those locations, 8 (53%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (47%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Wexford is ChargePoint Network with 10 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 68 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wexford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Wexford

Wexford, Pennsylvania, presents a unique landscape for EV charging infrastructure, with 15 public locations, of which more than half are DC fast chargers. The dominance of the ChargePoint Network, managing 67% of these sites, suggests a significant reliance on one operator for network reliability and pricing strategies. With an average charging power of 68 kW and a peak of 120 kW, local offerings lag behind the latest fast-charging standards, indicating opportunities for competitive entry with higher-capacity equipment. The mixed charging profile, with a focus on longer-dwell Level 2 options and around 9 DC fast ports, highlights gaps that new developments could strategically target to meet growing demand and optimize driver accessibility.

Wexford charging by the numbers

Locations
15
Chargers
26
DC Fast locations
8
Level 2 locations
7

DC fast share: 53% of locations. Level 2 share: 47%. Average chargers per site: 1.7. Average DC fast power: 68 kW.

Wexford charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 3 networks.
Average DC fast power
68 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
53% DC fast / 47% Level 2 across 15 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Wexford

The following operators run public charging in Wexford, ranked by number of locations.

Featured charging locations in Wexford

A selection of higher-power public charging locations across Wexford, sorted by power level.

  1. L292 EXPP PL 1 — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 120 kW)
  2. WRIGHT HYUNDAI HYUNDAI 1 50KW — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62.5 kW)
  3. L289 STATION 1 — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62.5 kW)
  4. WRIGHT HYUNDAI HYUNDAI 2 50KW — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62.5 kW)
  5. L289 STATION 2 — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62.5 kW)
  6. L288A CPE250–WEXFORD– — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62.5 kW)
  7. COCHRANAUTO WEX DC — Wexford, PA, 15090 (ChargePoint Network · DC Fast · 62 kW)
  8. Wright Automotive Group — Wexford, PA, 15090 (Non-Networked · DC Fast · 50 kW)
  9. L292 CP6K — Wexford, PA, 15090 (ChargePoint Network · Level 2 · 13.4 kW)
  10. Shults Ford Lincoln — Wexford, PA, 15090 (Non-Networked · Level 2 · 7.2 kW)
  11. Pittsburgh-Wexford - Tesla Service Center — Wexford, PA, 15090 (Non-Networked · Level 2 · 7.2 kW)
  12. Giant Eagle #43 - Pine Township — Wexford, PA, 15090 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Wexford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Wexford, Pennsylvania?
There are 15 public electric vehicle charging locations in Wexford, Pennsylvania, with a combined 26 individual chargers. 8 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Wexford?
ChargePoint Network operates the most public charging locations in Wexford with 10 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Wexford?
Level 2 EV chargers in Wexford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wexford?
Most Wexford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wexford?
A typical commercial Level 2 installation in Wexford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wexford take to become profitable?
Payback in Wexford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.