Install EV Chargers in Narberth, Pennsylvania

Install EV chargers or analyze a site in Narberth, Pennsylvania. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any Narberth address from EV Data Map by Charge Rigs.

Narberth, Pennsylvania is served by 10 public electric vehicle charging locations operating 22 individual chargers — an average of 2.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Narberth is FLO with 6 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Narberth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Narberth

Narberth, Pennsylvania presents a unique landscape for EV charging, dominated by a single operator, FLO, which manages 60% of the city’s ten public Level 2 charging locations. This heavy reliance on one network may offer operational benefits, but it also indicates potential challenges in uptime and pricing consistency for users. Notably, the absence of any DC fast charging options creates a significant gap in the market, as drivers seeking rapid charging solutions currently must leave the city. With all ten sites focused on Level 2 charging, there exists a distinct opportunity for new developments to cater to the high-demand for faster charging solutions, making Narberth a promising prospect for expansion in EV infrastructure.

Narberth charging by the numbers

Locations
10
Chargers
22
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.2. Average DC fast power: 0 kW.

Narberth charging — local snapshot

Top operator share
FLO runs 60% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in Narberth

The following operators run public charging in Narberth, ranked by number of locations.

Featured charging locations in Narberth

A selection of higher-power public charging locations across Narberth, sorted by power level.

  1. Narberth Borough - Municipal Lot — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  2. North Essex Curbside — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  3. Narberth Post Office — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  4. South Essex Curbside — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  5. Merion Avenue — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  6. Narberth Borough - Downtown Essex Av — Narberth, PA, 19072 (FLO · Level 2 · 7.2 kW)
  7. THE ELM STATION 3 — Narberth, PA, 19072 (ChargePoint Network · Level 2 · 6.5 kW)
  8. THE ELM STATION 4 — Narberth, PA, 19072 (ChargePoint Network · Level 2 · 6.5 kW)
  9. THE ELM STATION 1 — Narberth, PA, 19072 (ChargePoint Network · Level 2 · 6.5 kW)
  10. THE ELM STATION 2 — Narberth, PA, 19072 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Narberth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Narberth, Pennsylvania?
There are 10 public electric vehicle charging locations in Narberth, Pennsylvania, with a combined 22 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Narberth?
FLO operates the most public charging locations in Narberth with 6 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Narberth?
Level 2 EV chargers in Narberth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Narberth?
Most Narberth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Narberth?
A typical commercial Level 2 installation in Narberth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Narberth take to become profitable?
Payback in Narberth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.