Install EV Chargers in Villanova, Pennsylvania

Install EV chargers or analyze a site in Villanova, Pennsylvania. 15 existing public charging locations (0 DC fast, 15 Level 2). Free 0–100 profitability score on any Villanova address from EV Data Map by Charge Rigs.

Villanova, Pennsylvania is served by 15 public electric vehicle charging locations operating 29 individual chargers — an average of 1.9 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Villanova is ChargePoint Network with 15 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Villanova and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Villanova

In Villanova, Pennsylvania, the EV charging landscape is highly centralized with ChargePoint Network operating all 15 public Level 2 charging locations. This exclusive reliance on a single provider ensures consistent service but also highlights a significant gap: there are no DC fast charging options available in the city. As a result, residents and visitors looking for quick charging solutions are forced to seek options outside Villanova. The 100% Level 2 distribution caters primarily to users who have longer dwell times, indicating that developers may find valuable opportunities by introducing DC fast charging stations to meet the unmet needs of EV drivers seeking efficient, swift top-ups. Analyzing local traffic and demographics can help guide strategic site placements to capitalize on this demand.

Villanova charging by the numbers

Locations
15
Chargers
29
DC Fast locations
0
Level 2 locations
15

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.9. Average DC fast power: 0 kW.

Villanova charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Mix
0% DC fast / 100% Level 2 across 15 locations

Charging networks in Villanova

The following operators run public charging in Villanova, ranked by number of locations.

Featured charging locations in Villanova

A selection of higher-power public charging locations across Villanova, sorted by power level.

  1. VILLANOVA LAW GARAGE 2 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  2. VILLANOVA LAW GARAGE 1 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  3. VILLANOVA CEER 2 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  4. VILLANOVA CEER 3 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  5. VILLANOVA SAC GARAGE 2 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  6. VILLANOVA SAC GARAGE 3 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  7. VILLANOVA SAC GARAGE 1 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  8. VILLANOVA M1 GARAGE 2 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  9. VILLANOVA ITHAN GARAGE 3 — Villanova, PA, 19010 (ChargePoint Network · Level 2 · 6.5 kW)
  10. VILLANOVA ITHAN GARAGE 2 — Villanova, PA, 19010 (ChargePoint Network · Level 2 · 6.5 kW)
  11. VILLANOVA CEER 4 — Villanova, PA, 19085 (ChargePoint Network · Level 2 · 6.5 kW)
  12. VILLANOVA ITHAN GARAGE 1 — Villanova, PA, 19010 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Villanova specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Villanova, Pennsylvania?
There are 15 public electric vehicle charging locations in Villanova, Pennsylvania, with a combined 29 individual chargers. 0 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Villanova?
ChargePoint Network operates the most public charging locations in Villanova with 15 sites.
How much does it cost to install an EV charger in Villanova?
Level 2 EV chargers in Villanova typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Villanova?
Most Villanova projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Villanova?
A typical commercial Level 2 installation in Villanova energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Villanova take to become profitable?
Payback in Villanova depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage