Install EV chargers or analyze a site in Conshohocken, Pennsylvania. 23 existing public charging locations (3 DC fast, 20 Level 2). Free 0–100 profitability score on any Conshohocken address from EV Data Map by Charge Rigs.
Conshohocken, Pennsylvania is served by 23 public electric vehicle charging locations operating 66 individual chargers — an average of 2.9 chargers per site. Of those locations, 3 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Conshohocken is ChargePoint Network with 17 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 267 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Conshohocken and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Conshohocken
Conshohocken, Pennsylvania, stands out in the EV charging landscape with a notable concentration of ChargePoint Network locations, comprising 74% of the 23 public charging sites. This reliance on a single operator not only influences uptime and reliability but also impacts pricing strategies for potential site developers. The city boasts an impressive average power output of 267 kW across its three DC fast charging stations, with the fastest stall reaching 350 kW, placing them among the most capable in the region. Given that 100% of these fast chargers exceed 150 kW, new entrants offering similar power levels can effectively meet the demand for ultra-fast charging, making strategic placement essential for optimizing driver accessibility and attracting EV users navigating the area.
Conshohocken charging by the numbers
Locations
23
Chargers
66
DC Fast locations
3
Level 2 locations
20
DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 2.9. Average DC fast power: 267 kW.
Conshohocken charging — local snapshot
Top operator share
ChargePoint Network runs 74% of public locations across 7 networks.
Average DC fast power
267 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 23 locations
Estimated DC ports
20 fast-charging ports city-wide
Charging networks in Conshohocken
The following operators run public charging in Conshohocken, ranked by number of locations.
ChargePoint Network — 17 locations
Tesla — 1 location
Non-Networked — 1 location
Blink Network — 1 location
eVgo Network — 1 location
Tesla Destination — 1 location
Electrify America — 1 location
Featured charging locations in Conshohocken
A selection of higher-power public charging locations across Conshohocken, sorted by power level.
IKEA Store 211 (Conshohocken, PA) — Conshohocken, PA, 19428 (Electrify America · DC Fast · 350 kW)
IKEA - Tesla Supercharger — Conshohocken, PA, 19428 (Tesla · DC Fast · 250 kW)
Brixmor Plymouth Square — Conshohocken, PA, 19428 (eVgo Network · DC Fast · 200 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Conshohocken specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Conshohocken, Pennsylvania?
There are 23 public electric vehicle charging locations in Conshohocken, Pennsylvania, with a combined 66 individual chargers. 3 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Conshohocken?
ChargePoint Network operates the most public charging locations in Conshohocken with 17 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Conshohocken?
Level 2 EV chargers in Conshohocken typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Conshohocken?
Most Conshohocken projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Conshohocken?
A typical commercial Level 2 installation in Conshohocken energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Conshohocken take to become profitable?
Payback in Conshohocken depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.