Install EV chargers or analyze a site in Chattanooga, Tennessee. 71 existing public charging locations (12 DC fast, 59 Level 2). Free 0–100 profitability score on any Chattanooga address from EV Data Map by Charge Rigs.
Chattanooga, Tennessee is served by 71 public electric vehicle charging locations operating 205 individual chargers — an average of 2.9 chargers per site. Of those locations, 12 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 59 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Chattanooga is ChargePoint Network with 40 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 211 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chattanooga and receive an instant ROI score, demand projection, and recommended charger configuration.
Chattanooga boasts a robust and competitive public charging landscape, featuring 71 locations operated by 13 distinct networks, with ChargePoint Network leading at 56%. The city’s 12 DC fast charging sites average an impressive 211 kW, with the potential to reach up to 400 kW, positioning them among the fastest in the nation. Notably, 67% of these fast-charging stations are classified at 150 kW or higher, catering to the demand for rapid charging solutions. This diversity in charging options fosters a dynamic market where drivers can choose based on power and amenities rather than relying on a single provider. Chattanooga's mix of high-capacity DC fast chargers and Level 2 stations provides a comprehensive solution to varying EV charging needs, enhancing the experience for local drivers and visitors alike.
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.9. Average DC fast power: 211 kW.
The following operators run public charging in Chattanooga, ranked by number of locations.
A selection of higher-power public charging locations across Chattanooga, sorted by power level.
Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Chattanooga specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 12 DC fast and 59 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.