Install EV Chargers in Chattanooga, Tennessee

Install EV chargers or analyze a site in Chattanooga, Tennessee. 71 existing public charging locations (12 DC fast, 59 Level 2). Free 0–100 profitability score on any Chattanooga address from EV Data Map by Charge Rigs.

Chattanooga, Tennessee is served by 71 public electric vehicle charging locations operating 205 individual chargers — an average of 2.9 chargers per site. Of those locations, 12 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 59 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chattanooga is ChargePoint Network with 40 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 211 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chattanooga and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chattanooga

Chattanooga boasts a robust public charging landscape with 71 locations featuring a blend of 12 DC fast chargers and 59 Level 2 stations, creating a competitive environment marked by 13 distinct charging networks. The significant share of DC fast sites—17% overall—includes a remarkable 67% that deliver 150 kW or more, with the fastest option peaking at 400 kW. This ultra-fast charging capability allows EV drivers in Chattanooga to benefit from quick turnaround times, offering a strategic advantage for those prioritizing efficiency. Furthermore, the presence of multiple operators, particularly ChargePoint Network, which dominates with 56% of sites, encourages competitive pricing and uptime while enabling nuanced site selection based on power and amenities rather than brand loyalty.

Chattanooga charging by the numbers

Locations
71
Chargers
205
DC Fast locations
12
Level 2 locations
59

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.9. Average DC fast power: 211 kW.

Chattanooga charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 13 networks.
Average DC fast power
211 kW (fastest stall: 400 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 71 locations
Estimated DC ports
70 fast-charging ports city-wide

Charging networks in Chattanooga

The following operators run public charging in Chattanooga, ranked by number of locations.

Featured charging locations in Chattanooga

A selection of higher-power public charging locations across Chattanooga, sorted by power level.

  1. Hamilton Place Chattanooga MB.HPC — Chattanooga, TN, 37421 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Chattanooga Plant (Chattanooga, TN) — Chattanooga, TN, 37416 (Electrify America · DC Fast · 350 kW)
  3. Finley Stadium (Chattanooga, TN) — Chattanooga, TN, 37408 (Electrify America · DC Fast · 350 kW)
  4. River City Company Riverfront Parkway Lot (Chattanooga, TN) — Chattanooga, TN, 37402 (Electrify America · DC Fast · 350 kW)
  5. 2 North Shore - Tesla Supercharger — Chattanooga, TN, 37405 (Tesla · DC Fast · 250 kW)
  6. Hamilton Place Mall - Tesla Supercharger — Chattanooga, TN, 37421 (Tesla · DC Fast · 250 kW)
  7. EPB Camp Jordan — Chattanooga, TN, 37412 (ZEFNET · DC Fast · 150 kW)
  8. Chattanooga Airport (CHA) - Tesla Supercharger — Chattanooga, TN, 37421 (Tesla · DC Fast · 150 kW)
  9. Marshal Mize Ford — Chattanooga, TN, 37343 (FORD_CHARGE · DC Fast · 120 kW)
  10. MERCEDES 1 RAPID#1 — Chattanooga, TN, 37421 (ChargePoint Network · DC Fast · 62.5 kW)
  11. BMW Chattanooga — Chattanooga, TN, 37421 (CHAEVI · DC Fast · 60 kW)
  12. Mountain View Nissan — Chattanooga, TN, 37408 (Non-Networked · DC Fast · 44 kW)

Nearby cities with EV charging coverage

Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chattanooga specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 12 DC fast and 59 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chattanooga, Tennessee?
There are 71 public electric vehicle charging locations in Chattanooga, Tennessee, with a combined 205 individual chargers. 12 locations offer DC fast charging and 59 provide Level 2 charging.
What is the largest EV charging network in Chattanooga?
ChargePoint Network operates the most public charging locations in Chattanooga with 40 sites, followed by Blink Network with 11 sites.
How much does it cost to install an EV charger in Chattanooga?
Level 2 EV chargers in Chattanooga typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chattanooga?
Most Chattanooga projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chattanooga?
A typical commercial Level 2 installation in Chattanooga energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chattanooga take to become profitable?
Payback in Chattanooga depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.