Install EV Chargers in Knoxville, Tennessee

Install EV chargers or analyze a site in Knoxville, Tennessee. 70 existing public charging locations (13 DC fast, 57 Level 2). Free 0–100 profitability score on any Knoxville address from EV Data Map by Charge Rigs.

Knoxville, Tennessee is served by 70 public electric vehicle charging locations operating 233 individual chargers — an average of 3.3 chargers per site. Of those locations, 13 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 57 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Knoxville is Blink Network with 26 locations, followed by Non-Networked with 19. Average DC fast power across the city is approximately 185 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Knoxville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Knoxville

Knoxville offers a highly competitive EV charging landscape with 70 public locations supported by eight distinct operators, led by Blink Network. This diversity ensures a mix of pricing and uptime, making it essential for drivers to consider both power and amenities when selecting a charging site. The city boasts an impressive average DC fast charging power of 185 kW, with over half of its 13 DC fast locations classified at 150 kW or higher, catering to drivers seeking rapid charging solutions. With the fastest stall reaching 350 kW, Knoxville is positioned well to accommodate the demands of a growing EV market, while the substantial number of Level 2 chargers ensures accessibility for longer-dwell charging needs.

Knoxville charging by the numbers

Locations
70
Chargers
233
DC Fast locations
13
Level 2 locations
57

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.3. Average DC fast power: 185 kW.

Knoxville charging — local snapshot

Top operator share
Blink Network runs 37% of public locations across 8 networks.
Average DC fast power
185 kW (fastest stall: 350 kW)
High-power share
54% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 70 locations
Estimated DC ports
60 fast-charging ports city-wide

Charging networks in Knoxville

The following operators run public charging in Knoxville, ranked by number of locations.

Featured charging locations in Knoxville

A selection of higher-power public charging locations across Knoxville, sorted by power level.

  1. Walmart 2065 (Knoxville, TN) — Knoxville, TN, 37923 (Electrify America · DC Fast · 350 kW)
  2. Flying J 722 — Knoxville, TN, 37932 (eVgo Network · DC Fast · 350 kW)
  3. Pilot Travel Center 219 — Knoxville, TN, 37914 (eVgo Network · DC Fast · 350 kW)
  4. Target - Tesla Supercharger — Knoxville, TN, 37919 (Tesla · DC Fast · 325 kW)
  5. Brookview Town Centre - Tesla Supercharger — Knoxville, TN, 37919 (Tesla · DC Fast · 250 kW)
  6. Downtown Knoxville — Knoxville, TN, 37902 (ZEFNET · DC Fast · 150 kW)
  7. Pavilion of Turkey Creek - Tesla Supercharger — Knoxville, TN, 37934 (Tesla · DC Fast · 150 kW)
  8. Ted Russell Ford - Kingston Pike - Private DCFC — Knoxville, TN, 37919 (Blink Network · DC Fast · 120 kW)
  9. Ted Russell Ford - Kingston Pike - DCFC — Knoxville, TN, 37919 (Blink Network · DC Fast · 120 kW)
  10. LROVERKNOXVILLE CUSTOMER LEVEL3 — Knoxville, TN, 37922 (ChargePoint Network · DC Fast · 62.5 kW)
  11. LOCAL MARKET LOCAL #107 DC1 — Knoxville, TN, 37912 (ChargePoint Network · DC Fast · 62.5 kW)
  12. LOCAL MARKET LOCAL #107 DC2 — Knoxville, TN, 37912 (ChargePoint Network · DC Fast · 62.5 kW)

Nearby cities with EV charging coverage

Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Knoxville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 13 DC fast and 57 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Knoxville, Tennessee?
There are 70 public electric vehicle charging locations in Knoxville, Tennessee, with a combined 233 individual chargers. 13 locations offer DC fast charging and 57 provide Level 2 charging.
What is the largest EV charging network in Knoxville?
Blink Network operates the most public charging locations in Knoxville with 26 sites, followed by Non-Networked with 19 sites.
How much does it cost to install an EV charger in Knoxville?
Level 2 EV chargers in Knoxville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Knoxville?
Most Knoxville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Knoxville?
A typical commercial Level 2 installation in Knoxville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Knoxville take to become profitable?
Payback in Knoxville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage