Install EV chargers or analyze a site in Johnson City, Tennessee. 16 existing public charging locations (7 DC fast, 9 Level 2). Free 0–100 profitability score on any Johnson City address from EV Data Map by Charge Rigs.
Johnson City, Tennessee is served by 16 public electric vehicle charging locations operating 37 individual chargers — an average of 2.3 chargers per site. Of those locations, 7 (44%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (56%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Johnson City is ChargePoint Network with 9 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 187 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Johnson City and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Johnson City
Johnson City's EV charging landscape stands out with its competitive mix of operators and robust fast charging capabilities, featuring 16 public locations across 7 distinct networks. ChargePoint Network dominates with 56% of the sites, creating a diverse marketplace that encourages competitive pricing and uptime. The city's fast charging infrastructure is particularly notable, as the 7 DC fast stations average 187 kW, with over half of these sites classified at 150 kW or higher, catering to drivers seeking efficiency during their travels. With the fastest charging stall reaching an impressive 325 kW, Johnson City positions itself as an attractive stop for both local and corridor EV drivers, enhancing the overall convenience and attractiveness of its charging ecosystem.
Johnson City charging by the numbers
Locations
16
Chargers
37
DC Fast locations
7
Level 2 locations
9
DC fast share: 44% of locations. Level 2 share: 56%. Average chargers per site: 2.3. Average DC fast power: 187 kW.
Johnson City charging — local snapshot
Top operator share
ChargePoint Network runs 56% of public locations across 7 networks.
Average DC fast power
187 kW (fastest stall: 325 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
44% DC fast / 56% Level 2 across 16 locations
Estimated DC ports
19 fast-charging ports city-wide
Charging networks in Johnson City
The following operators run public charging in Johnson City, ranked by number of locations.
ChargePoint Network — 9 locations
Blink Network — 2 locations
FLO — 1 location
Tesla Destination — 1 location
Tesla — 1 location
EV Connect — 1 location
FORD_CHARGE — 1 location
Featured charging locations in Johnson City
A selection of higher-power public charging locations across Johnson City, sorted by power level.
Food City - Tesla Supercharger — Johnson City, TN, 37601 (Tesla · DC Fast · 325 kW)
BRIGHTRIDGE EV STATION 2 (R) — Johnson City, TN, 37601 (ChargePoint Network · DC Fast · 250 kW)
BRIGHTRIDGE EV STATION 1 (L) — Johnson City, TN, 37601 (ChargePoint Network · DC Fast · 250 kW)
Johnson City Ford — Johnson City, TN, 37601 (FORD_CHARGE · DC Fast · 240 kW)
Champion Chevrolet Cadillac — Johnson City, TN, 37601 (EV Connect · DC Fast · 120 kW)
FRIENDSHIPJCHYU FRONT SHOWROOM — Johnson City, TN, 37601 (ChargePoint Network · DC Fast · 62.5 kW)
FRIENDSHIPJCHYU SOUTH PARKING — Johnson City, TN, 37601 (ChargePoint Network · DC Fast · 62.5 kW)
Bank of Tennessee - Med Tech Branch — Johnson City, TN, 37604 (FLO · Level 2 · 19.2 kW)
BRIGHTRIDGE EV MAIN PARKING R — Johnson City, TN, 37615 (ChargePoint Network · Level 2 · 7.7 kW)
BRIGHTRIDGE EV MAIN PARKING L — Johnson City, TN, 37615 (ChargePoint Network · Level 2 · 7.7 kW)
Holiday Inn Express Johnson City - Tesla Destination — Johnson City, TN, 37615 (Tesla Destination · Level 2 · 7.2 kW)
Fairfield Inn and Suites Johnson City — Johnson City, TN, 37604 (Blink Network · Level 2 · 6.9 kW)
Nearby cities with EV charging coverage
Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Johnson City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Johnson City, Tennessee?
There are 16 public electric vehicle charging locations in Johnson City, Tennessee, with a combined 37 individual chargers. 7 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Johnson City?
ChargePoint Network operates the most public charging locations in Johnson City with 9 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Johnson City?
Level 2 EV chargers in Johnson City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Johnson City?
Most Johnson City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Johnson City?
A typical commercial Level 2 installation in Johnson City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Johnson City take to become profitable?
Payback in Johnson City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.