Install EV Chargers in Garland, Texas

Install EV chargers or analyze a site in Garland, Texas. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Garland address from EV Data Map by Charge Rigs.

Garland, Texas is served by 11 public electric vehicle charging locations operating 27 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Garland is ChargePoint Network with 4 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 210 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Garland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Garland

Garland, Texas, stands out in the EV charging landscape with its diverse mix of charging infrastructure, featuring 11 public locations served by 6 distinct operators. ChargePoint Network leads the way, accounting for 36% of sites, fostering competitive pricing and uptime that benefits local EV users. The city's two DC fast charging locations are particularly noteworthy, averaging 210 kW, with the fastest stall reaching 240 kW, positioning Garland among the leaders in ultra-fast charging options. With 100% of these fast sites classified at 150 kW and higher, drivers can optimize their charging choices based on power and available amenities, ensuring a seamless experience as they navigate local and surrounding areas.

Garland charging by the numbers

Locations
11
Chargers
27
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.5. Average DC fast power: 210 kW.

Garland charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 6 networks.
Average DC fast power
210 kW (fastest stall: 240 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
5 fast-charging ports city-wide

Charging networks in Garland

The following operators run public charging in Garland, ranked by number of locations.

Featured charging locations in Garland

A selection of higher-power public charging locations across Garland, sorted by power level.

  1. Randall Reed's Planet Ford 635 — Garland, TX, 75041 (FORD_CHARGE · DC Fast · 240 kW)
  2. RaceTrac — Garland, TX, 75043 (Non-Networked · DC Fast · 180 kW)
  3. One90 Firewheel Phase 3 — Garland, TX, 75044 (Blink Network · Level 2 · 10.4 kW)
  4. Embree Hill Apartments — Garland, TX, 75043 (LOOP · Level 2 · 7.7 kW)
  5. Holiday Inn Express & Suites Garland - Tesla Destination — Garland, TX, 75043 (Tesla Destination · Level 2 · 7.2 kW)
  6. Tru by Hilton Garland/Richardson - Tesla Destination — Garland, TX, 75040 (Tesla Destination · Level 2 · 7.2 kW)
  7. STREAM SDC DFW7 WEST 1 — Garland, TX, 75044 (ChargePoint Network · Level 2 · 6.5 kW)
  8. STREAM SDC DFW7 EAST 2 — Garland, TX, 75044 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CHARGING A GGC - 7B — Garland, TX, 75040 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CHARGING A GGC - 7A — Garland, TX, 75040 (ChargePoint Network · Level 2 · 6.5 kW)
  11. One90 Firewheel — Garland, TX, 75044 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Garland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Garland, Texas?
There are 11 public electric vehicle charging locations in Garland, Texas, with a combined 27 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Garland?
ChargePoint Network operates the most public charging locations in Garland with 4 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Garland?
Level 2 EV chargers in Garland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Garland?
Most Garland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Garland?
A typical commercial Level 2 installation in Garland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Garland take to become profitable?
Payback in Garland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage