Install EV Chargers in McKinney, Texas

Install EV chargers or analyze a site in McKinney, Texas. 27 existing public charging locations (7 DC fast, 20 Level 2). Free 0–100 profitability score on any McKinney address from EV Data Map by Charge Rigs.

McKinney, Texas is served by 27 public electric vehicle charging locations operating 78 individual chargers — an average of 2.9 chargers per site. Of those locations, 7 (26%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (74%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in McKinney is ChargePoint Network with 13 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 181 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in McKinney and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in McKinney

McKinney, Texas, features a competitive and diverse EV charging landscape with 27 public locations, including 7 DC fast chargers that average an impressive 181 kW. This substantial power capacity, highlighted by 43% of fast sites rated at 150 kW-class or higher, ensures that drivers can quickly replenish their vehicles. The presence of 8 distinct charging networks, led by ChargePoint Network with 48% of the sites, introduces healthy competition that can benefit pricing and uptime. Such diversity encourages EV drivers to consider their charging options based on power and amenities, rather than sticking to a single provider. This strategic blend of fast and Level 2 charging caters effectively to varied user needs, positioning McKinney as a notable choice for EV charging amidst its neighboring cities.

McKinney charging by the numbers

Locations
27
Chargers
78
DC Fast locations
7
Level 2 locations
20

DC fast share: 26% of locations. Level 2 share: 74%. Average chargers per site: 2.9. Average DC fast power: 181 kW.

McKinney charging — local snapshot

Top operator share
ChargePoint Network runs 48% of public locations across 8 networks.
Average DC fast power
181 kW (fastest stall: 400 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
26% DC fast / 74% Level 2 across 27 locations
Estimated DC ports
30 fast-charging ports city-wide

Charging networks in McKinney

The following operators run public charging in McKinney, ranked by number of locations.

Featured charging locations in McKinney

A selection of higher-power public charging locations across McKinney, sorted by power level.

  1. Walmart EV Charging — McKinney, TX, 75069 (WALMART · DC Fast · 400 kW)
  2. Stacy Plaza - Tesla Supercharger — McKinney, TX, 75070 (Tesla · DC Fast · 250 kW)
  3. 380 Crossing - Tesla Supercharger — McKinney, TX, 75071 (Tesla · DC Fast · 250 kW)
  4. BTF EV POWER LINK 1 — McKinney, TX, 75072 (ChargePoint Network · DC Fast · 120 kW)
  5. BTF EV POWER LINK 2 — McKinney, TX, 75072 (ChargePoint Network · DC Fast · 120 kW)
  6. BT SUBARU BT SUBARU 2 — McKinney, TX, 75070 (ChargePoint Network · DC Fast · 62.5 kW)
  7. BT SUBARU BT SUBARU 1 — McKinney, TX, 75070 (ChargePoint Network · DC Fast · 62.5 kW)
  8. ENXCHANGE SOUTH CHARGER — McKinney, TX, 75069 (ChargePoint Network · Level 2 · 19.2 kW)
  9. BTF EV BTM — McKinney, TX, 75070 (ChargePoint Network · Level 2 · 19.2 kW)
  10. ENXCHANGE ENX NORTH — McKinney, TX, 75069 (ChargePoint Network · Level 2 · 19.2 kW)
  11. Davis Development Ballfield — McKinney, TX, 75070 (Blink Network · Level 2 · 16.6 kW)
  12. Motel 6 - North McKinney — McKinney, TX, 75069 (UNIVERSAL · Level 2 · 11.2 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For McKinney specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in McKinney, Texas?
There are 27 public electric vehicle charging locations in McKinney, Texas, with a combined 78 individual chargers. 7 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in McKinney?
ChargePoint Network operates the most public charging locations in McKinney with 13 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in McKinney?
Level 2 EV chargers in McKinney typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in McKinney?
Most McKinney projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in McKinney?
A typical commercial Level 2 installation in McKinney energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in McKinney take to become profitable?
Payback in McKinney depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.