Install EV chargers or analyze a site in Airway Heights, Washington. 12 existing public charging locations (4 DC fast, 8 Level 2). Free 0–100 profitability score on any Airway Heights address from EV Data Map by Charge Rigs.
Airway Heights, Washington is served by 12 public electric vehicle charging locations operating 31 individual chargers — an average of 2.6 chargers per site. Of those locations, 4 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Airway Heights is ChargePoint Network with 6 locations, followed by OpConnect with 4. Average DC fast power across the city is approximately 12 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Airway Heights and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Airway Heights
Airway Heights, Washington, provides a balanced EV charging landscape with 12 public locations, including 4 DC fast chargers, representing 33% of the total. While the DC fast chargers average 12 kW, they fall short of contemporary standards, lacking higher-capacity options critical for increasing driver convenience. ChargePoint Network dominates with half of the charging sites, but the presence of three additional networks fosters competition. This unique mix positions Airway Heights as a strategic location for site developers seeking to fill the gaps for higher-capacity charging solutions, ensuring that the city evolves alongside the growing demand for more powerful infrastructure as regional traffic patterns shift.
Airway Heights charging by the numbers
Locations
12
Chargers
31
DC Fast locations
4
Level 2 locations
8
DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.6. Average DC fast power: 12 kW.
Airway Heights charging — local snapshot
Top operator share
ChargePoint Network runs 50% of public locations across 4 networks.
Average DC fast power
12 kW (fastest stall: 12 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 12 locations
Estimated DC ports
8 fast-charging ports city-wide
Charging networks in Airway Heights
The following operators run public charging in Airway Heights, ranked by number of locations.
ChargePoint Network — 6 locations
OpConnect — 4 locations
Non-Networked — 1 location
EV Connect — 1 location
Featured charging locations in Airway Heights
A selection of higher-power public charging locations across Airway Heights, sorted by power level.
Kalispel Tribe - Kalispel Development — AIRWAY HEIGHTS, WA, 99001 (OpConnect · DC Fast · 11.5 kW)
Kalispel Tribe - Parking Garage — AIRWAY HEIGHTS, WA, 99001 (OpConnect · DC Fast · 11.5 kW)
Kalispel Tribe - River Tower — AIRWAY HEIGHTS, WA, 99001 (OpConnect · DC Fast · 11.5 kW)
Kalispel Tribe - RV Park — AIRWAY HEIGHTS, WA, 99001 (OpConnect · DC Fast · 11.5 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Airway Heights specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Airway Heights, Washington?
There are 12 public electric vehicle charging locations in Airway Heights, Washington, with a combined 31 individual chargers. 4 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Airway Heights?
ChargePoint Network operates the most public charging locations in Airway Heights with 6 sites, followed by OpConnect with 4 sites.
How much does it cost to install an EV charger in Airway Heights?
Level 2 EV chargers in Airway Heights typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Airway Heights?
Most Airway Heights projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Airway Heights?
A typical commercial Level 2 installation in Airway Heights energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Airway Heights take to become profitable?
Payback in Airway Heights depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.