Install EV Chargers in Liberty Lake, Washington

Install EV chargers or analyze a site in Liberty Lake, Washington. 20 existing public charging locations (4 DC fast, 16 Level 2). Free 0–100 profitability score on any Liberty Lake address from EV Data Map by Charge Rigs.

Liberty Lake, Washington is served by 20 public electric vehicle charging locations operating 94 individual chargers — an average of 4.7 chargers per site. Of those locations, 4 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Liberty Lake is ChargePoint Network with 8 locations, followed by FLO with 6. Average DC fast power across the city is approximately 183 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Liberty Lake and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Liberty Lake

Liberty Lake boasts a competitive and diverse EV charging landscape with 20 public charging locations operated by six distinct networks, ensuring users have multiple options tailored to their needs. ChargePoint Network dominates with 40% of these sites, promoting competitive pricing and uptime. Notably, Liberty Lake features a robust offering of DC fast chargers, averaging 183 kW, with a significant 75% of installations at 150 kW or higher, including a peak of 250 kW at the fastest stall. This modern infrastructure serves both immediate and longer-dwell charging demands, making it crucial for drivers to select destinations by power and amenities rather than brand loyalty. As a result, the city’s EV ecosystem supports evolving driver preferences and engagement while addressing potential gaps in the charging network.

Liberty Lake charging by the numbers

Locations
20
Chargers
94
DC Fast locations
4
Level 2 locations
16

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 4.7. Average DC fast power: 183 kW.

Liberty Lake charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 6 networks.
Average DC fast power
183 kW (fastest stall: 250 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 20 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Liberty Lake

The following operators run public charging in Liberty Lake, ranked by number of locations.

Featured charging locations in Liberty Lake

A selection of higher-power public charging locations across Liberty Lake, sorted by power level.

  1. Liberty Lake, WA - Tesla Supercharger — Liberty Lake, WA, 99019 (Tesla · DC Fast · 250 kW)
  2. Trailhead Golf Course — Liberty Lake, WA, 99019 (EV Connect · DC Fast · 180 kW)
  3. Liberty Lake STA — Liberty Lake, WA, 99019 (EV Connect · DC Fast · 180 kW)
  4. Gee Liberty Lake Service Facility — Liberty Lake, WA, 99019 (Blink Network · DC Fast · 120 kW)
  5. Gee Liberty Lake Service Facility - Series — Liberty Lake, WA, 99019 (Blink Network · Level 2 · 16.6 kW)
  6. Central Valley SD - Ridgeline HS — Liberty Lake, WA, 99019 (FLO · Level 2 · 7.2 kW)
  7. Central Valley SD - Liberty Creek Elem — Liberty Lake, WA, 99019 (FLO · Level 2 · 7.2 kW)
  8. Rockwood PM - Bitterroot Lodge — Liberty Lake, WA, 99019 (FLO · Level 2 · 7.2 kW)
  9. Signal Point — Liberty Lake, WA, 99019 (DIRT_ROAD · Level 2 · 7.2 kW)
  10. Avista - Liberty Lake STA ACL2 — Liberty Lake, WA, 99019 (FLO · Level 2 · 7.2 kW)
  11. BIG TROUT LODGE CHARGER3 — Liberty Lake, WA, 99019 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HUB FIELDS STATION 1 — Liberty Lake, WA, 99016 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Liberty Lake specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Liberty Lake, Washington?
There are 20 public electric vehicle charging locations in Liberty Lake, Washington, with a combined 94 individual chargers. 4 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Liberty Lake?
ChargePoint Network operates the most public charging locations in Liberty Lake with 8 sites, followed by FLO with 6 sites.
How much does it cost to install an EV charger in Liberty Lake?
Level 2 EV chargers in Liberty Lake typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Liberty Lake?
Most Liberty Lake projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Liberty Lake?
A typical commercial Level 2 installation in Liberty Lake energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Liberty Lake take to become profitable?
Payback in Liberty Lake depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage