Install EV chargers or analyze a site in Medical Lake, Washington. 11 existing public charging locations (0 DC fast, 11 Level 2). Free 0–100 profitability score on any Medical Lake address from EV Data Map by Charge Rigs.
Medical Lake, Washington is served by 11 public electric vehicle charging locations operating 22 individual chargers — an average of 2.0 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Medical Lake is ChargePoint Network with 10 locations, followed by EV Connect with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Medical Lake and receive an instant ROI score, demand projection, and recommended charger configuration.
Medical Lake, Washington, presents a unique opportunity for EV charging infrastructure development, as it currently features no DC fast chargers among its 11 public locations, all of which are Level 2 stations. With ChargePoint Network operating 91% of these sites, developers must consider the implications of this concentration on pricing and reliability. The absence of fast-charging options means that EV drivers seeking quick top-ups are likely leaving the city, highlighting a significant gap in the current market. This lack of fast-charging infrastructure represents an untapped potential for new installations, allowing operators to cater to both the growing number of EV users and to neighboring cities that may experience higher traffic demand.
DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.0. Average DC fast power: 0 kW.
The following operators run public charging in Medical Lake, ranked by number of locations.
A selection of higher-power public charging locations across Medical Lake, sorted by power level.
Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Medical Lake specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.