Install EV Chargers in Kirkland, Washington

Install EV chargers or analyze a site in Kirkland, Washington. 57 existing public charging locations (6 DC fast, 51 Level 2). Free 0–100 profitability score on any Kirkland address from EV Data Map by Charge Rigs.

Kirkland, Washington is served by 57 public electric vehicle charging locations operating 162 individual chargers — an average of 2.8 chargers per site. Of those locations, 6 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 51 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Kirkland is ChargePoint Network with 32 locations, followed by Blink Network with 16. Average DC fast power across the city is approximately 174 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kirkland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Kirkland

Kirkland boasts a diverse public charging landscape, featuring 57 locations operated by seven distinct networks, with ChargePoint Network taking the lead at 56% of sites. This competitive environment fosters both pricing and uptime advantages, enticing drivers to choose charging options based on power and amenities. The area's six DC fast charging locations are particularly notable, averaging 174 kW and featuring a maximum speed of 350 kW, with half of these sites classified as 150 kW or higher. This modern infrastructure positions Kirkland favorably, especially for new entrants considering high-power setups in the 150–350 kW range. For site developers, leveraging this variety and power mix can effectively cater to local demand and improve overall driver satisfaction.

Kirkland charging by the numbers

Locations
57
Chargers
162
DC Fast locations
6
Level 2 locations
51

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.8. Average DC fast power: 174 kW.

Kirkland charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 7 networks.
Average DC fast power
174 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 57 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Kirkland

The following operators run public charging in Kirkland, ranked by number of locations.

Featured charging locations in Kirkland

A selection of higher-power public charging locations across Kirkland, sorted by power level.

  1. QFC 828 (Kirkland, WA) — Kirkland, WA, 98034 (Electrify America · DC Fast · 350 kW)
  2. Ford of Kirkland — Kirkland, WA, 98034 (Blink Network · DC Fast · 300 kW)
  3. Fred Meyer - Tesla Supercharger — Kirkland, WA, 98034 (Tesla · DC Fast · 250 kW)
  4. RAG - Alfa Romeo Kirkland — Kirkland, WA, 98034 (Blink Network · DC Fast · 60 kW)
  5. Lake Washington Institute of Technology — Kirkland, WA, 98034 (Blink Network · DC Fast · 60 kW)
  6. Volkswagen of Kirkland — Kirkland, WA, 98034 (Non-Networked · DC Fast · 25 kW)
  7. Windsor Totem Lake - West Building — Kirkland, WA, 98034 (Blink Network · Level 2 · 17.3 kW)
  8. Windsor Totem Lake - East Building — Kirkland, WA, 98034 (Blink Network · Level 2 · 17.3 kW)
  9. Weidner Apartment Homes — Kirkland, WA, 98034 (EV Connect · Level 2 · 9.6 kW)
  10. Capri Apartments — Kirkland, WA, 98033 (CHARGELAB · Level 2 · 9.6 kW)
  11. Lake Kirkland Park Condominium Association — Kirkland, WA, 98033 (EV Connect · Level 2 · 9.6 kW)
  12. Retail Space — Kirkland, WA, 98033 (CHARGELAB · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Kirkland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 51 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Kirkland, Washington?
There are 57 public electric vehicle charging locations in Kirkland, Washington, with a combined 162 individual chargers. 6 locations offer DC fast charging and 51 provide Level 2 charging.
What is the largest EV charging network in Kirkland?
ChargePoint Network operates the most public charging locations in Kirkland with 32 sites, followed by Blink Network with 16 sites.
How much does it cost to install an EV charger in Kirkland?
Level 2 EV chargers in Kirkland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Kirkland?
Most Kirkland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Kirkland?
A typical commercial Level 2 installation in Kirkland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Kirkland take to become profitable?
Payback in Kirkland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.