Install EV chargers or analyze a site in Shoreline, Washington. 14 existing public charging locations (6 DC fast, 8 Level 2). Free 0–100 profitability score on any Shoreline address from EV Data Map by Charge Rigs.

Shoreline, Washington is served by 14 public electric vehicle charging locations operating 137 individual chargers — an average of 9.8 chargers per site. Of those locations, 6 (43%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (57%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Shoreline is Blink Network with 5 locations, followed by ChargePoint Network with 5. Average DC fast power across the city is approximately 193 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Shoreline and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Shoreline

Shoreline stands out in the EV charging landscape with a competitive mix of 14 public locations that cater to diverse driver needs. Featuring 5 distinct charging networks, including a notable 36% contribution from Blink Network, the city offers a balanced selection of stations that keeps pricing and uptime favorable. The 6 DC fast charging stations, averaging a robust 193 kW, with 67% rated at 150 kW or higher, ensure that drivers have access to modern, high-power options critical for quick recharging. This versatility empowers users to choose based on power and amenities, shaping their charging experience without being tethered to a single brand, making Shoreline an appealing destination for EV drivers.

Shoreline charging by the numbers

Locations
14
Chargers
137
DC Fast locations
6
Level 2 locations
8

DC fast share: 43% of locations. Level 2 share: 57%. Average chargers per site: 9.8. Average DC fast power: 193 kW.

Shoreline charging — local snapshot

Top operator share
Blink Network runs 36% of public locations across 5 networks.
Average DC fast power
193 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
43% DC fast / 57% Level 2 across 14 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Shoreline

The following operators run public charging in Shoreline, ranked by number of locations.

Featured charging locations in Shoreline

A selection of higher-power public charging locations across Shoreline, sorted by power level.

  1. Kroger Fred Meyer 13 (Shoreline, WA) — Shoreline, WA, 98133 (Electrify America · DC Fast · 350 kW)
  2. Shoreline Marketplace - Tesla Supercharger — Shoreline, WA, 98133 (Tesla · DC Fast · 250 kW)
  3. CITY LIGHT SHORELINE 2 — Shoreline, WA, 98133 (ChargePoint Network · DC Fast · 160 kW)
  4. CITY LIGHT SHORELINE 1 — Shoreline, WA, 98133 (ChargePoint Network · DC Fast · 160 kW)
  5. CITY LIGHT SHORELINE 4 — Shoreline, WA, 98133 (ChargePoint Network · DC Fast · 120 kW)
  6. CITY LIGHT SHORELINE 3 — Shoreline, WA, 98133 (ChargePoint Network · DC Fast · 120 kW)
  7. Meadowbrook Apartments — Shoreline, WA, 98177 (Blink Network · Level 2 · 13.5 kW)
  8. Ballinger Commons — Shoreline, WA, 98133 (Blink Network · Level 2 · 10.8 kW)
  9. Canopy Apartments - Pay to charge — Shoreline, WA, 98133 (OpConnect · Level 2 · 7.7 kW)
  10. 145th Shoreline MUR-70 — Shoreline, WA, 98155 (OpConnect · Level 2 · 7.7 kW)
  11. SWD STATION 1 NORTH CITY #1 — Shoreline, WA, 98155 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Geo Apartments — Shoreline, WA, 98133 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Shoreline specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Shoreline, Washington?
There are 14 public electric vehicle charging locations in Shoreline, Washington, with a combined 137 individual chargers. 6 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Shoreline?
Blink Network operates the most public charging locations in Shoreline with 5 sites, followed by ChargePoint Network with 5 sites.
How much does it cost to install an EV charger in Shoreline?
Level 2 EV chargers in Shoreline typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Shoreline?
Most Shoreline projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Shoreline?
A typical commercial Level 2 installation in Shoreline energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Shoreline take to become profitable?
Payback in Shoreline depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.