Install EV Chargers in Bentonville, Arkansas

Install EV chargers or analyze a site in Bentonville, Arkansas. 37 existing public charging locations (5 DC fast, 32 Level 2). Free 0–100 profitability score on any Bentonville address from EV Data Map by Charge Rigs.

Bentonville, Arkansas is served by 37 public electric vehicle charging locations operating 127 individual chargers — an average of 3.4 chargers per site. Of those locations, 5 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 32 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bentonville is ChargePoint Network with 19 locations, followed by Blink Network with 6. Average DC fast power across the city is approximately 344 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bentonville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bentonville

Bentonville boasts a vibrant and competitive public charging landscape with 37 locations provided by seven distinct operators, led by ChargePoint Network at over half of the sites. This variety fosters a dynamic environment where drivers can choose based on power and amenities, rather than sticking to a single brand. With an impressive average DC fast charging power of 344 kW and the potential to reach up to 400 kW, 80% of these fast chargers are in the 150 kW-class or higher, positioning Bentonville as a leader in ultra-fast charging options. This strategic mix of DC fast and Level 2 ports effectively caters to both quick top-ups and longer-stay charging needs, making it a compelling location for EV infrastructure development.

Bentonville charging by the numbers

Locations
37
Chargers
127
DC Fast locations
5
Level 2 locations
32

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.4. Average DC fast power: 344 kW.

Bentonville charging — local snapshot

Top operator share
ChargePoint Network runs 51% of public locations across 7 networks.
Average DC fast power
344 kW (fastest stall: 400 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 37 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Bentonville

The following operators run public charging in Bentonville, ranked by number of locations.

Featured charging locations in Bentonville

A selection of higher-power public charging locations across Bentonville, sorted by power level.

  1. Walmart EV Charging — Bentonville, AR, 72712 (WALMART · DC Fast · 400 kW)
  2. Walmart EV Charging — Bentonville, AR, 72712 (WALMART · DC Fast · 400 kW)
  3. Walmart EV Charging — Bentonville, AR, 72712 (WALMART · DC Fast · 400 kW)
  4. Walmart EV Charging — Bentonville, AR, 72712 (WALMART · DC Fast · 400 kW)
  5. McLarty Daniel Lincoln Ford of Bentonville - DCFC — Bentonville, AR, 72712 (Blink Network · DC Fast · 120 kW)
  6. The Howard — Bentonville, AR, 72712 (Blink Network · Level 2 · 21.6 kW)
  7. 102 WEST EV EV1 — Bentonville, AR, 72712 (ChargePoint Network · Level 2 · 19.2 kW)
  8. First United Methodist Bentonville — Bentonville, AR, 72712 (EVGATEWAY · Level 2 · 19.2 kW)
  9. 102 WEST EV EV3 — Bentonville, AR, 72712 (ChargePoint Network · Level 2 · 19.2 kW)
  10. Benton House Carpets & Tile — Bentonville, AR, 72712 (Blink Network · Level 2 · 19.2 kW)
  11. 102 WEST EV EV2 — Bentonville, AR, 72712 (ChargePoint Network · Level 2 · 19.2 kW)
  12. McLarty Daniel Lincoln Ford of Bentonville - Series — Bentonville, AR, 72712 (Blink Network · Level 2 · 16.6 kW)

Nearby cities with EV charging coverage

Other cities in Arkansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bentonville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 32 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bentonville, Arkansas?
There are 37 public electric vehicle charging locations in Bentonville, Arkansas, with a combined 127 individual chargers. 5 locations offer DC fast charging and 32 provide Level 2 charging.
What is the largest EV charging network in Bentonville?
ChargePoint Network operates the most public charging locations in Bentonville with 19 sites, followed by Blink Network with 6 sites.
How much does it cost to install an EV charger in Bentonville?
Level 2 EV chargers in Bentonville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bentonville?
Most Bentonville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arkansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bentonville?
A typical commercial Level 2 installation in Bentonville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bentonville take to become profitable?
Payback in Bentonville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage