Install EV Chargers in Burlingame, California

Install EV chargers or analyze a site in Burlingame, California. 140 existing public charging locations (4 DC fast, 136 Level 2). Free 0–100 profitability score on any Burlingame address from EV Data Map by Charge Rigs.

Burlingame, California is served by 140 public electric vehicle charging locations operating 290 individual chargers — an average of 2.1 chargers per site. Of those locations, 4 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 136 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Burlingame is ChargePoint Network with 133 locations, followed by POWERFLEX with 2. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Burlingame and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Burlingame

Burlingame, California's charging infrastructure is notably characterized by its heavy reliance on the ChargePoint Network, which operates 95% of the city's 140 public charging stations. This concentration means that the performance and reliability of charging options will largely depend on a single operator, an important consideration for potential developers. While there are only 4 DC fast charging sites, their advanced capacity—averaging 150 kW and reaching up to 250 kW at the fastest location—positions them favorably in terms of power availability. As 50% of these fast sites are classified at 150 kW or higher, new entrants offering similar or superior power levels can capitalize on existing demand patterns. Additionally, with a mix of 3% DC fast stations and the remaining Level 2 chargers, there is an opportunity for further development to meet diverse charging needs in this area.

Burlingame charging by the numbers

Locations
140
Chargers
290
DC Fast locations
4
Level 2 locations
136

DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.1. Average DC fast power: 150 kW.

Burlingame charging — local snapshot

Top operator share
ChargePoint Network runs 95% of public locations across 7 networks.
Average DC fast power
150 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 140 locations
Estimated DC ports
40 fast-charging ports city-wide

Charging networks in Burlingame

The following operators run public charging in Burlingame, ranked by number of locations.

Featured charging locations in Burlingame

A selection of higher-power public charging locations across Burlingame, sorted by power level.

  1. Embassy Suites - San Francisco Airport Waterfront - Tesla Supercharger — Burlingame, CA, 94010 (Tesla · DC Fast · 250 kW)
  2. Burlingame Main Library — Burlingame, CA, 94010 (POWERFLEX · DC Fast · 150 kW)
  3. Chula Vista Lot HPCP — Burlingame, CA, 94010 (eVgo Network · DC Fast · 100 kW)
  4. Burlingame Library — Burlingame, CA, 94010 (POWERFLEX · DC Fast · 100 kW)
  5. TG BURLINGAME EV STATION 12 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  6. TG BURLINGAME EV STATION 3 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  7. TG BURLINGAME EV STATION 9 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  8. TG BURLINGAME EV STATION 6 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  9. TG BURLINGAME EV STATION 4 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  10. TG BURLINGAME EV STATION 8 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  11. TG BURLINGAME EV STATION 5 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)
  12. TG BURLINGAME EV STATION 10 — Burlingame, CA, 94010 (ChargePoint Network · Level 2 · 13.4 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Burlingame specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 136 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Burlingame, California?
There are 140 public electric vehicle charging locations in Burlingame, California, with a combined 290 individual chargers. 4 locations offer DC fast charging and 136 provide Level 2 charging.
What is the largest EV charging network in Burlingame?
ChargePoint Network operates the most public charging locations in Burlingame with 133 sites, followed by POWERFLEX with 2 sites.
How much does it cost to install an EV charger in Burlingame?
Level 2 EV chargers in Burlingame typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Burlingame?
Most Burlingame projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Burlingame?
A typical commercial Level 2 installation in Burlingame energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Burlingame take to become profitable?
Payback in Burlingame depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.