Install EV Chargers in Millbrae, California

Install EV chargers or analyze a site in Millbrae, California. 29 existing public charging locations (4 DC fast, 25 Level 2). Free 0–100 profitability score on any Millbrae address from EV Data Map by Charge Rigs.

Millbrae, California is served by 29 public electric vehicle charging locations operating 63 individual chargers — an average of 2.2 chargers per site. Of those locations, 4 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Millbrae is ChargePoint Network with 24 locations, followed by eVgo Network with 4. Average DC fast power across the city is approximately 145 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Millbrae and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Millbrae

Millbrae, California, features a concentrated EV charging landscape, with ChargePoint Network operating 83% of the city's 29 public charging locations, significantly influencing network reliability and operational consistency. The city hosts four DC fast charging sites, averaging 145 kW, with one reaching an impressive 350 kW, placing local options on the higher end of power performance. Notably, 25% of these fast chargers are 150 kW-class or greater, offering competitive appeal for drivers prioritizing speed. Meanwhile, the remaining infrastructure caters to prolonged dwell times with Level 2 chargers. This blend creates unique opportunities for site developers, particularly for those considering high-power hardware to attract EV drivers navigating the area’s dynamic charging needs.

Millbrae charging by the numbers

Locations
29
Chargers
63
DC Fast locations
4
Level 2 locations
25

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 2.2. Average DC fast power: 145 kW.

Millbrae charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 3 networks.
Average DC fast power
145 kW (fastest stall: 350 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 29 locations
Estimated DC ports
15 fast-charging ports city-wide

Charging networks in Millbrae

The following operators run public charging in Millbrae, ranked by number of locations.

Featured charging locations in Millbrae

A selection of higher-power public charging locations across Millbrae, sorted by power level.

  1. City of Millbrae - Library — Millbrae, CA, 94030 (eVgo Network · DC Fast · 350 kW)
  2. City of Millbrae - Magnolia — Millbrae, CA, 94030 (eVgo Network · DC Fast · 100 kW)
  3. Chevron #2200 — Millbrae, CA, 94030 (eVgo Network · DC Fast · 80 kW)
  4. City of Millbrae - Broadway — Millbrae, CA, 94030 (eVgo Network · DC Fast · 50 kW)
  5. SMUHSD MHS 4 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  6. SMUHSD MHS 3 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  7. SMUHSD MHS 2 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  8. SMUHSD MHS 1 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  9. SMUHSD MHS 5 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  10. SMUHSD MHS 6 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 9.6 kW)
  11. Millwood Inn and Suites - Tesla Destination — Millbrae, CA, 94030 (Tesla Destination · Level 2 · 7.2 kW)
  12. MILLBRAE 477 LINCOLN #2 — Millbrae, CA, 94030 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Millbrae specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Millbrae, California?
There are 29 public electric vehicle charging locations in Millbrae, California, with a combined 63 individual chargers. 4 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Millbrae?
ChargePoint Network operates the most public charging locations in Millbrae with 24 sites, followed by eVgo Network with 4 sites.
How much does it cost to install an EV charger in Millbrae?
Level 2 EV chargers in Millbrae typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Millbrae?
Most Millbrae projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Millbrae?
A typical commercial Level 2 installation in Millbrae energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Millbrae take to become profitable?
Payback in Millbrae depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.