Install EV Chargers in San Bruno, California

Install EV chargers or analyze a site in San Bruno, California. 18 existing public charging locations (4 DC fast, 14 Level 2). Free 0–100 profitability score on any San Bruno address from EV Data Map by Charge Rigs.

San Bruno, California is served by 18 public electric vehicle charging locations operating 101 individual chargers — an average of 5.6 chargers per site. Of those locations, 4 (22%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (78%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in San Bruno is ChargePoint Network with 10 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in San Bruno and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in San Bruno

San Bruno boasts a robust and competitive public charging landscape with 18 locations managed by six distinct operators, ensuring diverse options for EV drivers. ChargePoint Network dominates this market, accounting for 56% of the sites. Of particular note are the four DC fast charging stations, which average an impressive output of 250 kW, with one stall reaching up to 350 kW, placing San Bruno's infrastructure above the national standard for fast charging. This ultra-fast offering, paired with a blend of Level 2 chargers, caters to different charging needs and dwell times. As a result, EV drivers can strategically choose locations based on power and amenities rather than brand preference, enhancing the overall charging experience in the city.

San Bruno charging by the numbers

Locations
18
Chargers
101
DC Fast locations
4
Level 2 locations
14

DC fast share: 22% of locations. Level 2 share: 78%. Average chargers per site: 5.6. Average DC fast power: 250 kW.

San Bruno charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 6 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
22% DC fast / 78% Level 2 across 18 locations
Estimated DC ports
56 fast-charging ports city-wide

Charging networks in San Bruno

The following operators run public charging in San Bruno, ranked by number of locations.

Featured charging locations in San Bruno

A selection of higher-power public charging locations across San Bruno, sorted by power level.

  1. Chase Bank - 1200 El Camino Real — San Bruno, CA, 94066 (eVgo Network · DC Fast · 350 kW)
  2. The Shops at Tanforan - Tesla Supercharger — San Bruno, CA, 94066 (Tesla · DC Fast · 250 kW)
  3. Lunardi's Markets - Tesla Supercharger — San Bruno, CA, 94066 (Tesla · DC Fast · 250 kW)
  4. Bayhill Shopping Center - Tesla Supercharger — San Bruno, CA, 94066 (Tesla · DC Fast · 150 kW)
  5. SMUHSD CHS 2 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  6. SMUHSD CHS 1 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  7. SMUHSD CHS 5 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  8. SMUHSD CHS 6 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  9. SMUHSD CHS 3 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  10. SMUHSD CHS 4 — San Bruno, CA, 94066 (ChargePoint Network · Level 2 · 9.6 kW)
  11. Hotel Skye - Tesla Destination — San Bruno, CA, 94066 (Tesla Destination · Level 2 · 7.2 kW)
  12. San Bruno, CA - 1150 El Camino Real - Tesla Destination — San Bruno, CA, 94066 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For San Bruno specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in San Bruno, California?
There are 18 public electric vehicle charging locations in San Bruno, California, with a combined 101 individual chargers. 4 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in San Bruno?
ChargePoint Network operates the most public charging locations in San Bruno with 10 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in San Bruno?
Level 2 EV chargers in San Bruno typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in San Bruno?
Most San Bruno projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in San Bruno?
A typical commercial Level 2 installation in San Bruno energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in San Bruno take to become profitable?
Payback in San Bruno depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage