Install EV Chargers in Daly City, California

Install EV chargers or analyze a site in Daly City, California. 14 existing public charging locations (5 DC fast, 9 Level 2). Free 0–100 profitability score on any Daly City address from EV Data Map by Charge Rigs.

Daly City, California is served by 14 public electric vehicle charging locations operating 92 individual chargers — an average of 6.6 chargers per site. Of those locations, 5 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Daly City is ChargePoint Network with 8 locations, followed by eVgo Network with 3. Average DC fast power across the city is approximately 104 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Daly City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Daly City

Daly City, California, features a well-balanced EV charging landscape with 14 public locations, including 5 DC fast chargers that average 104 kW and peak at 250 kW, providing efficient options for drivers on the go. Notably, 20% of these fast chargers are 150 kW-class or higher, positioning Daly City strategically between moderate and high-power offerings, which can influence driver choices in navigation apps. With ChargePoint Network dominating the local market at 57% of sites and a mix of other providers like eVgo and Tesla, the city cultivates a competitive yet accessible charging environment, catering to diverse consumer needs while ensuring ample infrastructure support for EV adoption across the bustling Bay Area.

Daly City charging by the numbers

Locations
14
Chargers
92
DC Fast locations
5
Level 2 locations
9

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 6.6. Average DC fast power: 104 kW.

Daly City charging — local snapshot

Top operator share
ChargePoint Network runs 57% of public locations across 4 networks.
Average DC fast power
104 kW (fastest stall: 250 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 14 locations
Estimated DC ports
63 fast-charging ports city-wide

Charging networks in Daly City

The following operators run public charging in Daly City, ranked by number of locations.

Featured charging locations in Daly City

A selection of higher-power public charging locations across Daly City, sorted by power level.

  1. Mission Plaza Shopping Center - Tesla Supercharger — Daly City, CA, 94014 (Tesla · DC Fast · 250 kW)
  2. Serramonte Main Library — Daly City, CA, 94015 (eVgo Network · DC Fast · 100 kW)
  3. Serramonte Center - Tesla Supercharger — Daly City, CA, 94015 (Tesla · DC Fast · 72 kW)
  4. Lucky — Daly City, CA, 94014 (eVgo Network · DC Fast · 50 kW)
  5. Westlake Shopping Center — Daly City, CA, 94015 (eVgo Network · DC Fast · 50 kW)
  6. Genesis Station — Daly City, CA, 94014 (Blink Network · Level 2 · 11.5 kW)
  7. JEFFERSON JESD 1 — Daly City, CA, 94015 (ChargePoint Network · Level 2 · 6.5 kW)
  8. JEFFERSON TRP — Daly City, CA, 94014 (ChargePoint Network · Level 2 · 6.5 kW)
  9. M DALY, INC STATION 1 — Daly City, CA, 94015 (ChargePoint Network · Level 2 · 6.5 kW)
  10. JEFFERSON TE #2 2 — Daly City, CA, 94015 (ChargePoint Network · Level 2 · 6.5 kW)
  11. JEFFERSON FRS VISITOR DRO — Daly City, CA, 94015 (ChargePoint Network · Level 2 · 6.5 kW)
  12. M DALY, INC STATION 2 — Daly City, CA, 94015 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Daly City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Daly City, California?
There are 14 public electric vehicle charging locations in Daly City, California, with a combined 92 individual chargers. 5 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Daly City?
ChargePoint Network operates the most public charging locations in Daly City with 8 sites, followed by eVgo Network with 3 sites.
How much does it cost to install an EV charger in Daly City?
Level 2 EV chargers in Daly City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Daly City?
Most Daly City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Daly City?
A typical commercial Level 2 installation in Daly City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Daly City take to become profitable?
Payback in Daly City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.