Install EV Chargers in El Segundo, California

Install EV chargers or analyze a site in El Segundo, California. 55 existing public charging locations (1 DC fast, 54 Level 2). Free 0–100 profitability score on any El Segundo address from EV Data Map by Charge Rigs.

El Segundo, California is served by 55 public electric vehicle charging locations operating 158 individual chargers — an average of 2.9 chargers per site. Of those locations, 1 (2%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 54 (98%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in El Segundo is ChargePoint Network with 42 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in El Segundo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in El Segundo

El Segundo, California presents a distinctive landscape for EV charging, primarily dominated by ChargePoint Network, which manages 76% of the city's 55 public charging locations. With only 2% of sites offering DC fast charging—topped at a modest 50 kW—new operators have a unique opportunity to introduce higher-capacity stations to capture driver interest. The city's reliance on an aging charging infrastructure highlights the potential for disruption in a market ready for upgraded power solutions. As El Segundo caters primarily to longer-dwelling Level 2 charging, savvy site developers can leverage data insights on traffic and demographic patterns to identify unmet needs and capitalize on the local EV ecosystem.

El Segundo charging by the numbers

Locations
55
Chargers
158
DC Fast locations
1
Level 2 locations
54

DC fast share: 2% of locations. Level 2 share: 98%. Average chargers per site: 2.9. Average DC fast power: 50 kW.

El Segundo charging — local snapshot

Top operator share
ChargePoint Network runs 76% of public locations across 9 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
2% DC fast / 98% Level 2 across 55 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in El Segundo

The following operators run public charging in El Segundo, ranked by number of locations.

Featured charging locations in El Segundo

A selection of higher-power public charging locations across El Segundo, sorted by power level.

  1. Hyatt House El Segundo — El Segundo, CA, 90245 (eVgo Network · DC Fast · 50 kW)
  2. The Bolt EVCs — El Segundo, CA, 90245 (CHARGELAB · Level 2 · 11.5 kW)
  3. Hilton Garden Inn LAX El Segundo — El Segundo, CA, 90245 (RED_E · Level 2 · 9.6 kW)
  4. 3PR PORT 2 — El Segundo, CA, 90245 (ChargePoint Network · Level 2 · 9.6 kW)
  5. 3PR 3PHASES-NEW1 — El Segundo, CA, 90245 (ChargePoint Network · Level 2 · 7.7 kW)
  6. 1700 E Walnut Ave Garage — El Segundo, CA, 90245 (LOOP · Level 2 · 7.7 kW)
  7. 400 N Continental Blvd - Tesla Destination — El Segundo, CA, 90245 (Tesla Destination · Level 2 · 7.2 kW)
  8. CCM-MAC 2201 El Segundo LLC - Avison Young — El Segundo, CA, 90245 (EV Connect · Level 2 · 7.2 kW)
  9. LPC West — El Segundo, CA, 90245 (SYNERGEV · Level 2 · 7.2 kW)
  10. 777 S. Aviation - FAA — El Segundo, CA, 90245 (EV Connect · Level 2 · 7.2 kW)
  11. Embassy Suites by Hilton - LAX South - Tesla Destination — El Segundo, CA, 90245 (Tesla Destination · Level 2 · 7.2 kW)
  12. Hyatt Place Los Angeles — El Segundo, CA, 90245 (SYNERGEV · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For El Segundo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 54 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in El Segundo, California?
There are 55 public electric vehicle charging locations in El Segundo, California, with a combined 158 individual chargers. 1 locations offer DC fast charging and 54 provide Level 2 charging.
What is the largest EV charging network in El Segundo?
ChargePoint Network operates the most public charging locations in El Segundo with 42 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in El Segundo?
Level 2 EV chargers in El Segundo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in El Segundo?
Most El Segundo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in El Segundo?
A typical commercial Level 2 installation in El Segundo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in El Segundo take to become profitable?
Payback in El Segundo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.