Install EV chargers or analyze a site in Marina Del Rey, California. 16 existing public charging locations (2 DC fast, 14 Level 2). Free 0–100 profitability score on any Marina Del Rey address from EV Data Map by Charge Rigs.
Marina Del Rey, California is served by 16 public electric vehicle charging locations operating 147 individual chargers — an average of 9.2 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Marina Del Rey is POWERFLEX with 5 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Marina Del Rey and receive an instant ROI score, demand projection, and recommended charger configuration.
Marina Del Rey runs a comparatively competitive public charging market: 6 distinct operators share its 16 locations, with POWERFLEX the largest at 31% of sites. That diversity tends to keep pricing and uptime competitive but also makes corridor-style site selection more nuanced — drivers in Marina Del Rey pick on power and amenity rather than defaulting to a single brand. The 2 DC fast locations average 250 kW, with the fastest site at 250 kW. That is a ultra-fast fleet by current US standards; 100% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 13% of Marina Del Rey's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 18 DC fast ports across the city. EV Data Map scores any Marina Del Rey address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.
DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 9.2. Average DC fast power: 250 kW.
The following operators run public charging in Marina Del Rey, ranked by number of locations.
A selection of higher-power public charging locations across Marina Del Rey, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Marina Del Rey specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.