Install EV Chargers in Menlo Park, California

Install EV chargers or analyze a site in Menlo Park, California. 306 existing public charging locations (32 DC fast, 274 Level 2). Free 0–100 profitability score on any Menlo Park address from EV Data Map by Charge Rigs.

Menlo Park, California is served by 306 public electric vehicle charging locations operating 617 individual chargers — an average of 2.0 chargers per site. Of those locations, 32 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 274 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Menlo Park is ChargePoint Network with 300 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Menlo Park and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Menlo Park

Menlo Park, California's EV charging landscape is heavily influenced by the dominance of ChargePoint Network, which oversees 98% of the 305 public charging locations. This incredible concentration underscores the impact of a single operator on uptime and pricing, which site developers must consider when planning new installations. The city's 32 DC fast charging locations, averaging 118 kW, are relatively moderate by national standards, but with 31% of these sites rated at 150 kW or higher, there is potential for competitive advantage with higher-capacity offerings. As most charging is Level 2, addressing the 10% share of DC fast ports with stronger options could capture demand from EV drivers seeking faster charging solutions in this strategically positioned urban area.

Menlo Park charging by the numbers

Locations
306
Chargers
617
DC Fast locations
32
Level 2 locations
274

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 2.0. Average DC fast power: 120 kW.

Menlo Park charging — local snapshot

Top operator share
ChargePoint Network runs 98% of public locations across 6 networks.
Average DC fast power
120 kW (fastest stall: 250 kW)
High-power share
31% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 306 locations
Estimated DC ports
49 fast-charging ports city-wide

Charging networks in Menlo Park

The following operators run public charging in Menlo Park, ranked by number of locations.

Featured charging locations in Menlo Park

A selection of higher-power public charging locations across Menlo Park, sorted by power level.

  1. META MPK22-04 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  2. META MPK22-09 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  3. META MPK22-01 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  4. META MPK22-02 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  5. META MPK22-05 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  6. META MPK22-07 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  7. META MPK22-10 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  8. META MPK22-06 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  9. META MPK22-08 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  10. META MPK22-03 FC — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 250 kW)
  11. MP COMM CAMPUS DCEV-3 — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 80 kW)
  12. MP COMM CAMPUS DCEV-1 — Menlo Park, CA, 94025 (ChargePoint Network · DC Fast · 80 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Menlo Park specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 32 DC fast and 274 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Menlo Park, California?
There are 306 public electric vehicle charging locations in Menlo Park, California, with a combined 617 individual chargers. 32 locations offer DC fast charging and 274 provide Level 2 charging.
What is the largest EV charging network in Menlo Park?
ChargePoint Network operates the most public charging locations in Menlo Park with 300 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Menlo Park?
Level 2 EV chargers in Menlo Park typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Menlo Park?
Most Menlo Park projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Menlo Park?
A typical commercial Level 2 installation in Menlo Park energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Menlo Park take to become profitable?
Payback in Menlo Park depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage