Install EV chargers or analyze a site in Redwood City, California. 204 existing public charging locations (7 DC fast, 197 Level 2). Free 0–100 profitability score on any Redwood City address from EV Data Map by Charge Rigs.
Redwood City, California is served by 204 public electric vehicle charging locations operating 453 individual chargers — an average of 2.2 chargers per site. Of those locations, 7 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 197 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Redwood City is ChargePoint Network with 193 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 154 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Redwood City and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Redwood City
Redwood City's charging infrastructure is notably characterized by a strong dominance of the ChargePoint Network, comprising 95% of its 204 public charging stations. This concentration leads to a reliance on a single operator for uptime and network reliability, which is a crucial consideration for new developers. While only 3% of these locations are DC fast charging stations, the average power output of 154 kW and the presence of multiple high-capacity sites—29% rated at 150 kW or more—reflect a robust fast-charging offering. As competitors consider entry, leveraging higher power levels in the 150–350 kW range could be key to attracting drivers in a market where longer-dwell Level 2 charging dominates.
Redwood City charging by the numbers
Locations
204
Chargers
453
DC Fast locations
7
Level 2 locations
197
DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.2. Average DC fast power: 154 kW.
Redwood City charging — local snapshot
Top operator share
ChargePoint Network runs 95% of public locations across 10 networks.
Average DC fast power
154 kW (fastest stall: 500 kW)
High-power share
29% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 204 locations
Estimated DC ports
21 fast-charging ports city-wide
Charging networks in Redwood City
The following operators run public charging in Redwood City, ranked by number of locations.
ChargePoint Network — 193 locations
eVgo Network — 2 locations
Blink Network — 2 locations
7CHARGE — 1 location
CHARGELAB — 1 location
Tesla — 1 location
EPIC_CHARGING — 1 location
SYNERGEV — 1 location
Featured charging locations in Redwood City
A selection of higher-power public charging locations across Redwood City, sorted by power level.
Target - Tesla Supercharger — Redwood City, CA, 94061 (Tesla · DC Fast · 500 kW)
7Charge - Redwood City 25411 — Redwood City, CA, 94061 (7CHARGE · DC Fast · 180 kW)
WAYMO REDWOOD 13A — Redwood City, CA, 94063 (ChargePoint Network · DC Fast · 125 kW)
Marsh Manor Shopping Center — Redwood City, CA, 94063 (eVgo Network · DC Fast · 100 kW)
ORACLE RWSHORE 50P-014 LEV-3 — Redwood City, CA, 94065 (ChargePoint Network · DC Fast · 62.5 kW)
ORACLE RWSHORE 5OP-012 LEV-3 — Redwood City, CA, 94065 (ChargePoint Network · DC Fast · 62.5 kW)
Whole Foods Market — Redwood City, CA, 94062 (eVgo Network · DC Fast · 50 kW)
HOSPITAL SEQMAIN_GAR 4 — Redwood City, CA, 94062 (ChargePoint Network · Level 2 · 7.7 kW)
HOSPITAL SEQMAIN_GAR 9 — Redwood City, CA, 94062 (ChargePoint Network · Level 2 · 7.7 kW)
HOSPITAL SEQMAIN_GAR 7 — Redwood City, CA, 94062 (ChargePoint Network · Level 2 · 7.7 kW)
HOSPITAL SEQMAIN_GAR 6 — Redwood City, CA, 94062 (ChargePoint Network · Level 2 · 7.7 kW)
Best Western Plus Executive Suites — Redwood City, CA, 94063 (CHARGELAB · Level 2 · 7.7 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Redwood City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 197 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Redwood City, California?
There are 204 public electric vehicle charging locations in Redwood City, California, with a combined 453 individual chargers. 7 locations offer DC fast charging and 197 provide Level 2 charging.
What is the largest EV charging network in Redwood City?
ChargePoint Network operates the most public charging locations in Redwood City with 193 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Redwood City?
Level 2 EV chargers in Redwood City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Redwood City?
Most Redwood City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Redwood City?
A typical commercial Level 2 installation in Redwood City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Redwood City take to become profitable?
Payback in Redwood City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.