Install EV Chargers in Newark, California

Install EV chargers or analyze a site in Newark, California. 31 existing public charging locations (9 DC fast, 22 Level 2). Free 0–100 profitability score on any Newark address from EV Data Map by Charge Rigs.

Newark, California is served by 31 public electric vehicle charging locations operating 136 individual chargers — an average of 4.4 chargers per site. Of those locations, 9 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 22 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Newark is ChargePoint Network with 15 locations, followed by Tesla with 4. Average DC fast power across the city is approximately 209 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Newark and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Newark

Newark features a robust and competitive public EV charging landscape, showcasing 31 charging locations powered by 12 distinct operators, led by ChargePoint Network at nearly half of the sites. With a significant 29% of these locations offering DC fast charging, drivers can access impressive average power levels of 209 kW, including a standout stall that reaches 350 kW. The city’s DC fast infrastructure is particularly appealing, as 67% of sites deliver 150 kW or more, catering to the growing demand for ultra-fast charging options. This diversity in operators and charging speeds allows drivers more strategic choices based on power and amenities, setting Newark apart as a prime location for EV charging infrastructure development.

Newark charging by the numbers

Locations
31
Chargers
136
DC Fast locations
9
Level 2 locations
22

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 4.4. Average DC fast power: 209 kW.

Newark charging — local snapshot

Top operator share
ChargePoint Network runs 48% of public locations across 12 networks.
Average DC fast power
209 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 31 locations
Estimated DC ports
79 fast-charging ports city-wide

Charging networks in Newark

The following operators run public charging in Newark, ranked by number of locations.

Featured charging locations in Newark

A selection of higher-power public charging locations across Newark, sorted by power level.

  1. Save Mart FoodMaxx 462 (Newark, CA) — Newark, CA, 94560 (Electrify America · DC Fast · 350 kW)
  2. FoodMaxx Newark #462 — Newark, CA, 94560 (eVgo Network · DC Fast · 350 kW)
  3. Cedar Springs - Tesla Supercharger — Newark, CA, 94560 (Tesla · DC Fast · 325 kW)
  4. Old Town Center - Tesla Supercharger — Newark, CA, 94560 (Tesla · DC Fast · 250 kW)
  5. Aloft Silicon Valley - Tesla Supercharger — Newark, CA, 94560 (Tesla · DC Fast · 250 kW)
  6. 6104 Jarvis Ave — Newark, CA, 94560 (EV Connect · DC Fast · 150 kW)
  7. ChargeNet - Taco Bell — Newark, CA, 94560 (CHARGENET · DC Fast · 75 kW)
  8. Lazy Dog Restaurant - Tesla Supercharger — Newark, CA, 94560 (Tesla · DC Fast · 72 kW)
  9. ETM ETM DC FAST — Newark, CA, 94560 (ChargePoint Network · DC Fast · 62.5 kW)
  10. Ohlone College - Newark Campus — Newark, CA, 94560 (Blink Network · Level 2 · 8.6 kW)
  11. DoubleTree Newark — Newark, CA, 94560 (EVCS · Level 2 · 7.6 kW)
  12. Invesmaster - 3900 — Newark, CA, 94560 (SYNERGEV · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Newark specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 22 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Newark, California?
There are 31 public electric vehicle charging locations in Newark, California, with a combined 136 individual chargers. 9 locations offer DC fast charging and 22 provide Level 2 charging.
What is the largest EV charging network in Newark?
ChargePoint Network operates the most public charging locations in Newark with 15 sites, followed by Tesla with 4 sites.
How much does it cost to install an EV charger in Newark?
Level 2 EV chargers in Newark typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Newark?
Most Newark projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Newark?
A typical commercial Level 2 installation in Newark energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Newark take to become profitable?
Payback in Newark depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.