Install EV Chargers in Union City, California

Install EV chargers or analyze a site in Union City, California. 28 existing public charging locations (4 DC fast, 24 Level 2). Free 0–100 profitability score on any Union City address from EV Data Map by Charge Rigs.

Union City, California is served by 28 public electric vehicle charging locations operating 69 individual chargers — an average of 2.5 chargers per site. Of those locations, 4 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 24 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Union City is ChargePoint Network with 24 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Union City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Union City

Union City, California, features a charging infrastructure heavily influenced by ChargePoint Network, which dominates with 86% of the 28 public locations. The city boasts a strong offering of DC fast charging options, with four sites averaging 250 kW and reaching up to 350 kW—indicative of the ultra-fast capabilities appealing to EV drivers. Notably, 75% of these DC fast chargers are 150 kW-class or higher, ensuring competitive power levels in the local landscape. With the primary reliance on ChargePoint, prospective site developers should take into account this concentration, as it shapes factors like uptime and pricing. Additionally, the blend of 14% DC fast and predominately Level 2 charging options highlights varied user needs, making an analysis of Union City's infrastructure vital for identifying strategic site placements.

Union City charging by the numbers

Locations
28
Chargers
69
DC Fast locations
4
Level 2 locations
24

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 2.5. Average DC fast power: 250 kW.

Union City charging — local snapshot

Top operator share
ChargePoint Network runs 86% of public locations across 4 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 28 locations
Estimated DC ports
23 fast-charging ports city-wide

Charging networks in Union City

The following operators run public charging in Union City, ranked by number of locations.

Featured charging locations in Union City

A selection of higher-power public charging locations across Union City, sorted by power level.

  1. El Mercado Plaza Shopping Center — Union City, CA, 94587 (eVgo Network · DC Fast · 350 kW)
  2. Walmart 2031 (Union City, CA) — Union City, CA, 94587 (Electrify America · DC Fast · 350 kW)
  3. Union Square Marketplace - Tesla Supercharger — Union City, CA, 94587 (Tesla · DC Fast · 250 kW)
  4. Union City Smith Street Parking — Union City, CA, 94587 (eVgo Network · DC Fast · 50 kW)
  5. UNION SANITARY USD-(17)-P — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  6. UNION SANITARY USD 3 — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  7. UNION SANITARY USD-(16)-P — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  8. UNION SANITARY USD-(9)-P — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  9. UNION SANITARY USD-(4)-F — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY HALL STAFF CITY HALL 1 — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  11. UNION SANITARY USD-(25)-P — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)
  12. UNION SANITARY USD-(11)-P — Union City, CA, 94587 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Union City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 24 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Union City, California?
There are 28 public electric vehicle charging locations in Union City, California, with a combined 69 individual chargers. 4 locations offer DC fast charging and 24 provide Level 2 charging.
What is the largest EV charging network in Union City?
ChargePoint Network operates the most public charging locations in Union City with 24 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Union City?
Level 2 EV chargers in Union City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Union City?
Most Union City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Union City?
A typical commercial Level 2 installation in Union City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Union City take to become profitable?
Payback in Union City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.