Install EV Chargers in Redlands, California

Install EV chargers or analyze a site in Redlands, California. 33 existing public charging locations (17 DC fast, 16 Level 2). Free 0–100 profitability score on any Redlands address from EV Data Map by Charge Rigs.

Redlands, California is served by 33 public electric vehicle charging locations operating 133 individual chargers — an average of 4.0 chargers per site. Of those locations, 17 (52%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (48%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Redlands is ChargePoint Network with 20 locations, followed by SYNERGEV with 4. Average DC fast power across the city is approximately 184 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Redlands and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Redlands

Public charging in Redlands, California is dominated by ChargePoint Network, which runs 61% of the 33 public locations across the city. That concentration means uptime, pricing and network reliability hinge heavily on a single operator — a fact worth weighing when you plan a competing site. The 17 DC fast locations average 184 kW, with the fastest site at 350 kW. That is a modern high-power fleet by current US standards; 59% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 52% of Redlands's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 67 DC fast ports across the city. EV Data Map scores any Redlands address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Redlands charging by the numbers

Locations
33
Chargers
133
DC Fast locations
17
Level 2 locations
16

DC fast share: 52% of locations. Level 2 share: 48%. Average chargers per site: 4.0. Average DC fast power: 184 kW.

Redlands charging — local snapshot

Top operator share
ChargePoint Network runs 61% of public locations across 8 networks.
Average DC fast power
184 kW (fastest stall: 350 kW)
High-power share
59% of DC fast sites are 150 kW-class or higher
Mix
52% DC fast / 48% Level 2 across 33 locations
Estimated DC ports
67 fast-charging ports city-wide

Charging networks in Redlands

The following operators run public charging in Redlands, ranked by number of locations.

Featured charging locations in Redlands

A selection of higher-power public charging locations across Redlands, sorted by power level.

  1. Tri-City Shopping Center — Redlands, CA, 92374 (eVgo Network · DC Fast · 350 kW)
  2. BOA Redlands Main CA6-130 (Redlands, CA) — Redlands, CA, 92373 (Electrify America · DC Fast · 350 kW)
  3. Redlands Town Center - Tesla Supercharger — Redlands, CA, 92374 (Tesla · DC Fast · 325 kW)
  4. Downtown Parking Garage - Tesla Supercharger — Redlands, CA, 92374 (Tesla · DC Fast · 250 kW)
  5. IN-N-OUT LUGONIA 03 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  6. IN-N-OUT LUGONIA 05 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  7. IN-N-OUT LUGONIA 01 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  8. IN-N-OUT LUGONIA 02 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  9. IN-N-OUT LUGONIA 04 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  10. IN-N-OUT LUGONIA 06 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  11. Tom Bell Chevy — Redlands, CA, 92374 (Blink Network · DC Fast · 60 kW)
  12. CHEVRON REDLANDS #3 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 50 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Redlands specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 17 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Redlands, California?
There are 33 public electric vehicle charging locations in Redlands, California, with a combined 133 individual chargers. 17 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Redlands?
ChargePoint Network operates the most public charging locations in Redlands with 20 sites, followed by SYNERGEV with 4 sites.
How much does it cost to install an EV charger in Redlands?
Level 2 EV chargers in Redlands typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Redlands?
Most Redlands projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Redlands?
A typical commercial Level 2 installation in Redlands energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Redlands take to become profitable?
Payback in Redlands depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage