Install EV Chargers in Redlands, California

Install EV chargers or analyze a site in Redlands, California. 33 existing public charging locations (17 DC fast, 16 Level 2). Free 0–100 profitability score on any Redlands address from EV Data Map by Charge Rigs.

Redlands, California is served by 33 public electric vehicle charging locations operating 133 individual chargers — an average of 4.0 chargers per site. Of those locations, 17 (52%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (48%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Redlands is ChargePoint Network with 20 locations, followed by SYNERGEV with 4. Average DC fast power across the city is approximately 184 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Redlands and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Redlands

Redlands, California, offers a robust EV charging landscape with a notable concentration of DC fast charging stations, comprising 52% of the 33 public locations. The average power output of 184 kW means that drivers can expect efficient charging times, especially with 59% of fast-charging sites rated at 150 kW or higher. ChargePoint Network dominates the scene with 61% of the locations, creating a reliance on a single operator for service reliability and pricing. This presents opportunities for competing sites, particularly those equipped with high-power hardware ranging from 150 to 350 kW, aligning with driver preferences for faster charging options. The strategic mix of DC fast and Level 2 chargers positions Redlands as a competitive target for further infrastructure investment.

Redlands charging by the numbers

Locations
33
Chargers
133
DC Fast locations
17
Level 2 locations
16

DC fast share: 52% of locations. Level 2 share: 48%. Average chargers per site: 4.0. Average DC fast power: 184 kW.

Redlands charging — local snapshot

Top operator share
ChargePoint Network runs 61% of public locations across 8 networks.
Average DC fast power
184 kW (fastest stall: 350 kW)
High-power share
59% of DC fast sites are 150 kW-class or higher
Mix
52% DC fast / 48% Level 2 across 33 locations
Estimated DC ports
67 fast-charging ports city-wide

Charging networks in Redlands

The following operators run public charging in Redlands, ranked by number of locations.

Featured charging locations in Redlands

A selection of higher-power public charging locations across Redlands, sorted by power level.

  1. Tri-City Shopping Center — Redlands, CA, 92374 (eVgo Network · DC Fast · 350 kW)
  2. BOA Redlands Main CA6-130 (Redlands, CA) — Redlands, CA, 92373 (Electrify America · DC Fast · 350 kW)
  3. Redlands Town Center - Tesla Supercharger — Redlands, CA, 92374 (Tesla · DC Fast · 325 kW)
  4. IN-N-OUT LUGONIA 03 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  5. IN-N-OUT LUGONIA 05 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  6. IN-N-OUT LUGONIA 01 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  7. IN-N-OUT LUGONIA 02 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  8. IN-N-OUT LUGONIA 04 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  9. IN-N-OUT LUGONIA 06 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 250 kW)
  10. Downtown Parking Garage - Tesla Supercharger — Redlands, CA, 92374 (Tesla · DC Fast · 250 kW)
  11. Tom Bell Chevy — Redlands, CA, 92374 (Blink Network · DC Fast · 60 kW)
  12. CHEVRON REDLANDS #2 — Redlands, CA, 92374 (ChargePoint Network · DC Fast · 50 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Redlands specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 17 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Redlands, California?
There are 33 public electric vehicle charging locations in Redlands, California, with a combined 133 individual chargers. 17 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Redlands?
ChargePoint Network operates the most public charging locations in Redlands with 20 sites, followed by SYNERGEV with 4 sites.
How much does it cost to install an EV charger in Redlands?
Level 2 EV chargers in Redlands typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Redlands?
Most Redlands projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Redlands?
A typical commercial Level 2 installation in Redlands energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Redlands take to become profitable?
Payback in Redlands depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage