Install EV Chargers in Turlock, California

Install EV chargers or analyze a site in Turlock, California. 21 existing public charging locations (3 DC fast, 18 Level 2). Free 0–100 profitability score on any Turlock address from EV Data Map by Charge Rigs.

Turlock, California is served by 21 public electric vehicle charging locations operating 63 individual chargers — an average of 3.0 chargers per site. Of those locations, 3 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Turlock is ChargePoint Network with 13 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 308 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Turlock and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Turlock

Turlock, California, offers a robust charging landscape distinguished by its heavy reliance on the ChargePoint Network, which accounts for 62% of the city’s 21 public charging locations. This concentration suggests that site developers should consider the implications of network reliability and pricing strategies, as well as the competitive advantage of high-output DC fast charging options. With an average power of 308 kW and all DC fast stations exceeding 150 kW, Turlock boasts one of the most powerful charging infrastructures in the region. The presence of 28 DC fast ports indicates a strategic opportunity to attract EV drivers looking for quick and efficient charging solutions while balancing the longer dwell times provided by Level 2 chargers.

Turlock charging by the numbers

Locations
21
Chargers
63
DC Fast locations
3
Level 2 locations
18

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.0. Average DC fast power: 308 kW.

Turlock charging — local snapshot

Top operator share
ChargePoint Network runs 62% of public locations across 5 networks.
Average DC fast power
308 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 21 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Turlock

The following operators run public charging in Turlock, ranked by number of locations.

Featured charging locations in Turlock

A selection of higher-power public charging locations across Turlock, sorted by power level.

  1. Walmart 1963 (Turlock, CA) — Turlock, CA, 95380 (Electrify America · DC Fast · 350 kW)
  2. Chevron - Tesla Supercharger — Turlock, CA, 95380 (Tesla · DC Fast · 325 kW)
  3. Countryside Plaza - Tesla Supercharger — Turlock, CA, 95380 (Tesla · DC Fast · 250 kW)
  4. California State University - Stanislaus — Turlock, CA, 95382 (Non-Networked · Level 2 · 7.2 kW)
  5. Las Casuelas Restaurant - Tesla Destination — Turlock, CA, 95380 (Tesla Destination · Level 2 · 7.2 kW)
  6. California State University - Stanislaus — Turlock, CA, 95382 (Non-Networked · Level 2 · 7.2 kW)
  7. California State University - Stanislaus — Turlock, CA, 95382 (Non-Networked · Level 2 · 7.2 kW)
  8. California State University - Stanislaus — Turlock, CA, 95382 (Non-Networked · Level 2 · 7.2 kW)
  9. WEST MAIN ST MAIN ST 4 — Turlock, CA, 95380 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TID CANAL — Turlock, CA, 95380 (ChargePoint Network · Level 2 · 6.5 kW)
  11. TID LAMO — Turlock, CA, 95380 (ChargePoint Network · Level 2 · 6.5 kW)
  12. TID BROADWAY — Turlock, CA, 95380 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Turlock specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Turlock, California?
There are 21 public electric vehicle charging locations in Turlock, California, with a combined 63 individual chargers. 3 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Turlock?
ChargePoint Network operates the most public charging locations in Turlock with 13 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Turlock?
Level 2 EV chargers in Turlock typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Turlock?
Most Turlock projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Turlock?
A typical commercial Level 2 installation in Turlock energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Turlock take to become profitable?
Payback in Turlock depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage