Install EV chargers or analyze a site in Modesto, California. 43 existing public charging locations (16 DC fast, 27 Level 2). Free 0–100 profitability score on any Modesto address from EV Data Map by Charge Rigs.
Modesto, California is served by 43 public electric vehicle charging locations operating 172 individual chargers — an average of 4.0 chargers per site. Of those locations, 16 (37%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (63%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Modesto is ChargePoint Network with 23 locations, followed by EV Connect with 4. Average DC fast power across the city is approximately 155 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Modesto and receive an instant ROI score, demand projection, and recommended charger configuration.
Modesto offers a dynamic public charging landscape with 43 locations, featuring 11 distinct operators that foster competitive pricing and uptime. ChargePoint Network dominates this scene with over half of the sites, ensuring drivers have choices tailored to their power and amenity preferences. Notably, the 16 DC fast charging stations average 155 kW, with 44% categorized as 150 kW-class or higher, reflecting a robust high-power offering conducive to efficient charging experiences. The presence of a 350 kW stall highlights the city’s commitment to modern infrastructure. As residents and visitors navigate Modesto's charging options, the mix of fast and Level 2 stations meets diverse needs while revealing opportunities for further enhancement based on traffic and demographic data.
DC fast share: 37% of locations. Level 2 share: 63%. Average chargers per site: 4.0. Average DC fast power: 155 kW.
The following operators run public charging in Modesto, ranked by number of locations.
A selection of higher-power public charging locations across Modesto, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Modesto specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 16 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.