Install EV chargers or analyze a site in Modesto, California. 43 existing public charging locations (16 DC fast, 27 Level 2). Free 0–100 profitability score on any Modesto address from EV Data Map by Charge Rigs.
Modesto, California is served by 43 public electric vehicle charging locations operating 172 individual chargers — an average of 4.0 chargers per site. Of those locations, 16 (37%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (63%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Modesto is ChargePoint Network with 23 locations, followed by EV Connect with 4. Average DC fast power across the city is approximately 155 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Modesto and receive an instant ROI score, demand projection, and recommended charger configuration.
Modesto's EV charging landscape stands out with its robust variety of 43 public charging locations, featuring 16 DC fast chargers that average 155 kW, with a peak of 350 kW available at the fastest stall. This diverse charging ecosystem, supported by 11 distinct operators—primarily ChargePoint Network—promotes competitive pricing and reliability, while allowing drivers to select charging locations based on power levels and amenities rather than brand loyalty. Notably, 44% of the DC fast sites offer 150 kW-class stations or higher, ensuring that as new entrants join the market, they can provide high-capacity options that cater to both short and long-distance users. With a substantial mix of fast and Level 2 chargers, Modesto is positioned to meet varied charging needs efficiently.
DC fast share: 37% of locations. Level 2 share: 63%. Average chargers per site: 4.0. Average DC fast power: 155 kW.
The following operators run public charging in Modesto, ranked by number of locations.
A selection of higher-power public charging locations across Modesto, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Modesto specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 16 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.