Install EV chargers or analyze a site in Manteca, California. 54 existing public charging locations (8 DC fast, 46 Level 2). Free 0–100 profitability score on any Manteca address from EV Data Map by Charge Rigs.
Manteca, California is served by 54 public electric vehicle charging locations operating 163 individual chargers — an average of 3.0 chargers per site. Of those locations, 8 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 46 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Manteca is ChargePoint Network with 42 locations, followed by Electrify America with 3. Average DC fast power across the city is approximately 282 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Manteca and receive an instant ROI score, demand projection, and recommended charger configuration.
Manteca, California, presents a unique landscape for EV charging with 54 public locations, predominantly governed by ChargePoint Network, which accounts for 78% of these sites, ensuring considerable reliability for operators and users alike. Among these, the 8 DC fast locations are particularly notable, averaging a robust 282 kW, with a peak stall capacity of 350 kW, positioning them at the forefront of charging speed in the region. While 15% of all public stations offer DC fast charging for quick stops, the majority cater to longer dwell times via Level 2 alternatives. This combination creates a strategic balance of fast and standard charging options, making Manteca an attractive location for potential site developers to consider in their planning.
DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 3.0. Average DC fast power: 282 kW.
The following operators run public charging in Manteca, ranked by number of locations.
A selection of higher-power public charging locations across Manteca, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Manteca specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 46 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.