Install EV chargers or analyze a site in Estes Park, Colorado. 19 existing public charging locations (6 DC fast, 13 Level 2). Free 0–100 profitability score on any Estes Park address from EV Data Map by Charge Rigs.
Estes Park, Colorado is served by 19 public electric vehicle charging locations operating 44 individual chargers — an average of 2.3 chargers per site. Of those locations, 6 (32%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (68%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Estes Park is ChargePoint Network with 11 locations, followed by Tesla Destination with 4. Average DC fast power across the city is approximately 169 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Estes Park and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Estes Park
Estes Park boasts a robust electric vehicle charging landscape featuring 19 public locations, with a strong emphasis on DC fast charging, which comprises 32% of the infrastructure. The city is home to 6 distinct charging networks, led by ChargePoint Network, which operates 58% of the sites, ensuring competitive pricing and service reliability. Notably, the average DC fast charger delivers 169 kW, with a top rate of 200 kW available, positioning Estes Park ahead of many cities in terms of power capability. With 83% of DC fast stations rated 150 kW or higher, drivers can choose from a variety of options that balance power and amenities, making it an appealing stop for both local and traveling EV users.
Estes Park charging by the numbers
Locations
19
Chargers
44
DC Fast locations
6
Level 2 locations
13
DC fast share: 32% of locations. Level 2 share: 68%. Average chargers per site: 2.3. Average DC fast power: 169 kW.
Estes Park charging — local snapshot
Top operator share
ChargePoint Network runs 58% of public locations across 6 networks.
Average DC fast power
169 kW (fastest stall: 200 kW)
High-power share
83% of DC fast sites are 150 kW-class or higher
Mix
32% DC fast / 68% Level 2 across 19 locations
Estimated DC ports
12 fast-charging ports city-wide
Charging networks in Estes Park
The following operators run public charging in Estes Park, ranked by number of locations.
ChargePoint Network — 11 locations
Tesla Destination — 4 locations
Blink Network — 1 location
EV Connect — 1 location
Tesla — 1 location
TURNONGREEN — 1 location
Featured charging locations in Estes Park
A selection of higher-power public charging locations across Estes Park, sorted by power level.
DC CORRIDOR ESTES PARK PL2 — Estes Park, CO, 80517 (ChargePoint Network · DC Fast · 200 kW)
DC CORRIDOR ESTES PARK PL4 — Estes Park, CO, 80517 (ChargePoint Network · DC Fast · 200 kW)
DC CORRIDOR ESTES PARK PL3 — Estes Park, CO, 80517 (ChargePoint Network · DC Fast · 200 kW)
DC CORRIDOR ESTES PARK PL1 — Estes Park, CO, 80517 (ChargePoint Network · DC Fast · 200 kW)
The Stanley Hotel - Tesla Supercharger — Estes Park, CO, 80517 (Tesla · DC Fast · 150 kW)
YMCA - EPC CFWB DCFC — Estes Park, CO, 80517 (ChargePoint Network · DC Fast · 62 kW)
Twin Owls Steakhouse — Estes Park, CO, 80517 (Blink Network · Level 2 · 21.6 kW)
NP Village — Estes Park, CO, 80517 (EV Connect · Level 2 · 19.2 kW)
Best Western Plus Silver Saddle Inn — Estes Park, CO, 80517 (TURNONGREEN · Level 2 · 11 kW)
River Stone Resorts and Bear Paw Suites - Tesla Destination — Estes Park, CO, 80517 (Tesla Destination · Level 2 · 7.2 kW)
Beaver Brook on the River - Tesla Destination — Estes Park, CO, 80517 (Tesla Destination · Level 2 · 7.2 kW)
The Stanley Hotel - Tesla Destination — Estes Park, CO, 80517 (Tesla Destination · Level 2 · 7.2 kW)
Nearby cities with EV charging coverage
Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Estes Park specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Estes Park, Colorado?
There are 19 public electric vehicle charging locations in Estes Park, Colorado, with a combined 44 individual chargers. 6 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Estes Park?
ChargePoint Network operates the most public charging locations in Estes Park with 11 sites, followed by Tesla Destination with 4 sites.
How much does it cost to install an EV charger in Estes Park?
Level 2 EV chargers in Estes Park typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Estes Park?
Most Estes Park projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Estes Park?
A typical commercial Level 2 installation in Estes Park energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Estes Park take to become profitable?
Payback in Estes Park depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.