Install EV chargers or analyze a site in Fort Collins, Colorado. 102 existing public charging locations (8 DC fast, 94 Level 2). Free 0–100 profitability score on any Fort Collins address from EV Data Map by Charge Rigs.
Fort Collins, Colorado is served by 102 public electric vehicle charging locations operating 247 individual chargers — an average of 2.4 chargers per site. Of those locations, 8 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 94 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Fort Collins is ChargePoint Network with 63 locations, followed by ENERTECH with 10. Average DC fast power across the city is approximately 154 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fort Collins and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Fort Collins
Fort Collins boasts a well-developed EV charging network led by ChargePoint, which operates 62% of the city's 102 public locations. This concentration on a single operator enhances reliability but also presents a competitive opportunity for new site developers to differentiate themselves. The city features a robust fast-charging infrastructure, with 63% of DC fast stations offering 150 kW or more, peaking at 250 kW. While just 8% of public locations are dedicated to DC fast charging, the combination of powerful chargers and the prevalence of Level 2 stations addresses various driver needs. Understanding the local power dynamics and the competitive landscape will be crucial for ensuring long-term viability and attracting EV drivers in Fort Collins.
Fort Collins charging by the numbers
Locations
102
Chargers
247
DC Fast locations
8
Level 2 locations
94
DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.4. Average DC fast power: 154 kW.
Fort Collins charging — local snapshot
Top operator share
ChargePoint Network runs 62% of public locations across 10 networks.
Average DC fast power
154 kW (fastest stall: 250 kW)
High-power share
63% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 102 locations
Estimated DC ports
10 fast-charging ports city-wide
Charging networks in Fort Collins
The following operators run public charging in Fort Collins, ranked by number of locations.
ChargePoint Network — 63 locations
ENERTECH — 10 locations
Non-Networked — 9 locations
Blink Network — 8 locations
AUTEL — 5 locations
Tesla Destination — 3 locations
RED_E — 1 location
EVMATCH — 1 location
Featured charging locations in Fort Collins
A selection of higher-power public charging locations across Fort Collins, sorted by power level.
GPM INVESTMENTS 4587 DC1 — Fort Collins, CO, 80525 (ChargePoint Network · DC Fast · 250 kW)
GPM INVESTMENTS 4587 DC2 — Fort Collins, CO, 80525 (ChargePoint Network · DC Fast · 250 kW)
7649 Rea Pkwy — Fort Collins, CO, 80528 (EV Connect · DC Fast · 200 kW)
Lincoln Learning Center Fort Collins — Fort Collins, CO, 80525 (RED_E · DC Fast · 151 kW)
Lincoln Learning Center — Fort Collins, CO, 80525 (Non-Networked · DC Fast · 150 kW)
LARIMERCOUNTY 200OAK-1 — Fort Collins, CO, 80521 (ChargePoint Network · DC Fast · 120 kW)
MARKLEY MOTOR 1 MARKLEY GM CP2 — Fort Collins, CO, 80525 (ChargePoint Network · DC Fast · 62.5 kW)
Jax Outdoor Gear — Fort Collins, CO, 80524 (eVgo Network · DC Fast · 50 kW)
Fossil Creek Condos - Enertech — Fort Collins, CO, 80525 (AUTEL · Level 2 · 19.2 kW)
Fossil Creek Condos — Fort Collins, CO, 80525 (ENERTECH · Level 2 · 19.2 kW)
Summitview Church — Fort Collins, CO, 80526 (ENERTECH · Level 2 · 19.2 kW)
Plymouth Congregational Church — Fort Collins, CO, 80526 (ENERTECH · Level 2 · 19.2 kW)
Nearby cities with EV charging coverage
Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Fort Collins specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 94 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Fort Collins, Colorado?
There are 102 public electric vehicle charging locations in Fort Collins, Colorado, with a combined 247 individual chargers. 8 locations offer DC fast charging and 94 provide Level 2 charging.
What is the largest EV charging network in Fort Collins?
ChargePoint Network operates the most public charging locations in Fort Collins with 63 sites, followed by ENERTECH with 10 sites.
How much does it cost to install an EV charger in Fort Collins?
Level 2 EV chargers in Fort Collins typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fort Collins?
Most Fort Collins projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fort Collins?
A typical commercial Level 2 installation in Fort Collins energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fort Collins take to become profitable?
Payback in Fort Collins depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.