Install EV Chargers in Greeley, Colorado

Install EV chargers or analyze a site in Greeley, Colorado. 18 existing public charging locations (6 DC fast, 12 Level 2). Free 0–100 profitability score on any Greeley address from EV Data Map by Charge Rigs.

Greeley, Colorado is served by 18 public electric vehicle charging locations operating 64 individual chargers — an average of 3.6 chargers per site. Of those locations, 6 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Greeley is ChargePoint Network with 8 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 200 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Greeley and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Greeley

Greeley, Colorado's EV charging infrastructure stands out due to its competitive landscape, featuring 18 public charging locations managed by five distinct operators, with ChargePoint Network leading at 44% market share. This variety fosters a nuanced selection process for drivers, who can prioritize charging speed and amenities. The six DC fast charging sites, averaging 200 kW, include the city's fastest stall at 350 kW, positioning Greeley among the leaders in ultra-fast charging options. Notably, 83% of these fast chargers are rated at 150 kW or higher, catering to the increasing demand for rapid power. With 33% of public locations dedicated to DC fast charging, Greeley's infrastructure balances quick charge capabilities with a robust supply of Level 2 options for longer dwell times, appealing to diverse EV user needs.

Greeley charging by the numbers

Locations
18
Chargers
64
DC Fast locations
6
Level 2 locations
12

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 3.6. Average DC fast power: 200 kW.

Greeley charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 5 networks.
Average DC fast power
200 kW (fastest stall: 350 kW)
High-power share
83% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 18 locations
Estimated DC ports
13 fast-charging ports city-wide

Charging networks in Greeley

The following operators run public charging in Greeley, ranked by number of locations.

Featured charging locations in Greeley

A selection of higher-power public charging locations across Greeley, sorted by power level.

  1. Regency Center Place of Greeley (Greeley, CO) — Greeley, CO, 80634 (Electrify America · DC Fast · 350 kW)
  2. HION NETWORK GREELEY PL1 — Greeley, CO, 80634 (ChargePoint Network · DC Fast · 200 kW)
  3. HION NETWORK GREELEY PL2 — Greeley, CO, 80634 (ChargePoint Network · DC Fast · 200 kW)
  4. HION NETWORK GREELEY PL3 — Greeley, CO, 80634 (ChargePoint Network · DC Fast · 200 kW)
  5. HION NETWORK GREELEY PL4 — Greeley, CO, 80634 (ChargePoint Network · DC Fast · 200 kW)
  6. Greeley Nissan — Greeley, CO, 80634 (Non-Networked · DC Fast · 50 kW)
  7. Roche Construction — Greeley, CO, 80634 (Blink Network · Level 2 · 17.3 kW)
  8. Days Inn & Suites Greeley — Greeley, CO, 80634 (ENERTECH · Level 2 · 16.6 kW)
  9. Country Inn & Suites Greeley — Greeley, CO, 80631 (ENERTECH · Level 2 · 16.6 kW)
  10. The Element Apartments — Greeley, CO, 80634 (Blink Network · Level 2 · 13.5 kW)
  11. UCHealth Greeley Hospital — Greeley, CO, 80634 (Blink Network · Level 2 · 11.5 kW)
  12. [353233] NWDN Greeley West — Greeley, CO, 80634 (Blink Network · Level 2 · 10.8 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Greeley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Greeley, Colorado?
There are 18 public electric vehicle charging locations in Greeley, Colorado, with a combined 64 individual chargers. 6 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Greeley?
ChargePoint Network operates the most public charging locations in Greeley with 8 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Greeley?
Level 2 EV chargers in Greeley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Greeley?
Most Greeley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Greeley?
A typical commercial Level 2 installation in Greeley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Greeley take to become profitable?
Payback in Greeley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage