Install EV Chargers in Beverly, Massachusetts

Install EV chargers or analyze a site in Beverly, Massachusetts. 40 existing public charging locations (0 DC fast, 40 Level 2). Free 0–100 profitability score on any Beverly address from EV Data Map by Charge Rigs.

Beverly, Massachusetts is served by 40 public electric vehicle charging locations operating 109 individual chargers — an average of 2.7 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 40 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Beverly is ChargePoint Network with 36 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Beverly and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Beverly

Beverly, Massachusetts, presents a unique opportunity for EV charging infrastructure, as the city currently offers 40 public locations, all of which are Level 2 chargers, with no DC fast options available. With ChargePoint Network dominating the scene at 90% of these sites, the reliance on a single operator showcases both the potential for consistent uptime and the challenges of competition in this market. The absence of DC fast chargers creates a significant gap, indicating that local EV drivers seeking quick top-ups may need to travel outside the city. This scenario highlights an ideal prospect for developers looking to establish fast-charging stations, addressing unmet demand and enhancing EV convenience for Beverly's residents.

Beverly charging by the numbers

Locations
40
Chargers
109
DC Fast locations
0
Level 2 locations
40

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.7. Average DC fast power: 0 kW.

Beverly charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 4 networks.
Mix
0% DC fast / 100% Level 2 across 40 locations

Charging networks in Beverly

The following operators run public charging in Beverly, ranked by number of locations.

Featured charging locations in Beverly

A selection of higher-power public charging locations across Beverly, sorted by power level.

  1. LONG HILL LONG HILL — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 19.2 kW)
  2. Beverly Police Department — Beverly, MA, 01915 (AMPUP · Level 2 · 7.2 kW)
  3. Cummings Center — Beverly, MA, 01801 (Non-Networked · Level 2 · 7.2 kW)
  4. AMPHENOL STATION 2 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  5. AMPHENOL STATION 1 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CUMMINGS PROP 100 CUMMINGSC 3 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CUMMINGS PROP 50 BALCH 2 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BEVERLY STATION 1 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TOZER STATION 1 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CUMMINGS PROP WEST GARAGE 4 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CUMMINGS PROP 100 CUMMINGSC 2 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)
  12. BEVERLY STATION 3 — Beverly, MA, 01915 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Beverly specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 40 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Beverly, Massachusetts?
There are 40 public electric vehicle charging locations in Beverly, Massachusetts, with a combined 109 individual chargers. 0 locations offer DC fast charging and 40 provide Level 2 charging.
What is the largest EV charging network in Beverly?
ChargePoint Network operates the most public charging locations in Beverly with 36 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Beverly?
Level 2 EV chargers in Beverly typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Beverly?
Most Beverly projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Beverly?
A typical commercial Level 2 installation in Beverly energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Beverly take to become profitable?
Payback in Beverly depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.