Install EV Chargers in Dartmouth, Massachusetts

Install EV chargers or analyze a site in Dartmouth, Massachusetts. 24 existing public charging locations (2 DC fast, 22 Level 2). Free 0–100 profitability score on any Dartmouth address from EV Data Map by Charge Rigs.

Dartmouth, Massachusetts is served by 24 public electric vehicle charging locations operating 60 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 22 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Dartmouth is ChargePoint Network with 20 locations, followed by AMPUP with 1. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dartmouth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Dartmouth

Dartmouth, Massachusetts, features a concentrated public EV charging landscape with ChargePoint Network managing 83% of its 24 locations, underscoring a significant reliance on a single operator for charging reliability and pricing. The city boasts two DC fast charging sites, averaging an impressive 300 kW, with one reaching up to 350 kW, placing them among the fastest available in the region. While only 8% of the charging locations are DC fast chargers, they cater to high-demand drivers seeking rapid refills, making them a prime target for new operators aiming to deliver competitive offerings. With the balance leaning toward Level 2 chargers, there are ample opportunities for future growth in both fast and longer-dwell charging solutions.

Dartmouth charging by the numbers

Locations
24
Chargers
60
DC Fast locations
2
Level 2 locations
22

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.5. Average DC fast power: 300 kW.

Dartmouth charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 5 networks.
Average DC fast power
300 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 24 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Dartmouth

The following operators run public charging in Dartmouth, ranked by number of locations.

Featured charging locations in Dartmouth

A selection of higher-power public charging locations across Dartmouth, sorted by power level.

  1. PREIT Dartmouth Mall (Dartmouth, MA) — Dartmouth, MA, 02747 (Electrify America · DC Fast · 350 kW)
  2. Dartmouth Towne Center Shopping Mall - Tesla Supercharger — Dartmouth, MA, 02747 (Tesla · DC Fast · 250 kW)
  3. Colonial Imports South, Inc - Honda of Dartmouth — Dartmouth, MA, 02747 (Blink Network · Level 2 · 10.6 kW)
  4. Darthmouth Nissan — Dartmouth, MA, 02747 (AMPUP · Level 2 · 7.2 kW)
  5. UMASSD CCB 1 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  6. UMASSD BALSAM 2 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  7. UMASSD BIRCH 1 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  8. UMASSD IVY 2 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  9. UMASSD OAKGLN 1 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TOWN DARTMOUTH TOWN HALL — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)
  11. TOWN DARTMOUTH COA — Dartmouth, MA, 02748 (ChargePoint Network · Level 2 · 6.5 kW)
  12. UMASSD SENG 1 — Dartmouth, MA, 02747 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Dartmouth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 22 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Dartmouth, Massachusetts?
There are 24 public electric vehicle charging locations in Dartmouth, Massachusetts, with a combined 60 individual chargers. 2 locations offer DC fast charging and 22 provide Level 2 charging.
What is the largest EV charging network in Dartmouth?
ChargePoint Network operates the most public charging locations in Dartmouth with 20 sites, followed by AMPUP with 1 sites.
How much does it cost to install an EV charger in Dartmouth?
Level 2 EV chargers in Dartmouth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Dartmouth?
Most Dartmouth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Dartmouth?
A typical commercial Level 2 installation in Dartmouth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Dartmouth take to become profitable?
Payback in Dartmouth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.