Install EV Chargers in Middleborough, Massachusetts
Install EV chargers or analyze a site in Middleborough, Massachusetts. 22 existing public charging locations (6 DC fast, 16 Level 2). Free 0–100 profitability score on any Middleborough address from EV Data Map by Charge Rigs.
Middleborough, Massachusetts is served by 22 public electric vehicle charging locations operating 43 individual chargers — an average of 2.0 chargers per site. Of those locations, 6 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Middleborough is ChargePoint Network with 19 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Middleborough and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Middleborough
Middleborough, Massachusetts, showcases a robust electric vehicle charging landscape, with ChargePoint Network controlling 86% of its 22 public charging locations. This concentration results in a strong reliance on a single operator for both uptime and pricing, a crucial consideration for potential competitors. The city stands out with 27% of its charging options being DC fast chargers, averaging an impressive 250 kW and all classified at 150 kW or higher. This ultra-fast power capability is significant for attracting drivers in navigation apps. Additionally, EV Data Map can help identify strategic opportunities in the surrounding areas, enhancing access to charging in nearby cities like Bridgewater and Plymouth while addressing local demand.
Middleborough charging by the numbers
Locations
22
Chargers
43
DC Fast locations
6
Level 2 locations
16
DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.0. Average DC fast power: 250 kW.
Middleborough charging — local snapshot
Top operator share
ChargePoint Network runs 86% of public locations across 4 networks.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 22 locations
Estimated DC ports
6 fast-charging ports city-wide
Charging networks in Middleborough
The following operators run public charging in Middleborough, ranked by number of locations.
ChargePoint Network — 19 locations
Non-Networked — 1 location
TURNONGREEN — 1 location
RED_E — 1 location
Featured charging locations in Middleborough
A selection of higher-power public charging locations across Middleborough, sorted by power level.
MIDDLEBOROUGH PEARL ST. L3 #2 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
MIDDLEBOROUGH PEARL ST. L3 #1 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
MIDDLEBOROUGH JACKSON L3 #1 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
MIDDLEBOROUGH TOWN HALL L3 #2 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
MIDDLEBOROUGH JACKSON L3 #2 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
MIDDLEBOROUGH TOWN HALL L3 #1 — Middleborough, MA, 02346 (ChargePoint Network · DC Fast · 250 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Middleborough specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Middleborough, Massachusetts?
There are 22 public electric vehicle charging locations in Middleborough, Massachusetts, with a combined 43 individual chargers. 6 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Middleborough?
ChargePoint Network operates the most public charging locations in Middleborough with 19 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Middleborough?
Level 2 EV chargers in Middleborough typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Middleborough?
Most Middleborough projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Middleborough?
A typical commercial Level 2 installation in Middleborough energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Middleborough take to become profitable?
Payback in Middleborough depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.