Install EV chargers or analyze a site in Ann Arbor, Michigan. 131 existing public charging locations (21 DC fast, 110 Level 2). Free 0–100 profitability score on any Ann Arbor address from EV Data Map by Charge Rigs.
Ann Arbor, Michigan is served by 131 public electric vehicle charging locations operating 300 individual chargers — an average of 2.3 chargers per site. Of those locations, 21 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 110 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Ann Arbor is ChargePoint Network with 110 locations, followed by RED_E with 4. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ann Arbor and receive an instant ROI score, demand projection, and recommended charger configuration.
In Ann Arbor, Michigan, the public charging landscape is shaped significantly by ChargePoint Network, which operates a dominant 84% of the city's 131 charging locations. The city's offering includes a robust fleet of 21 DC fast charging stations, averaging an impressive 150 kW, with 43% classified as 150 kW or higher, positioning them well against competitors. This concentration in both operator and power capacity creates a unique advantage for new entrants targeting high-demand locations. With around 60 DC fast ports throughout the area, site developers will want to consider the potential for servicing longer-dwell charging needs, as well as the competitive dynamics at play in this market, particularly given the modern power curve that influences driver preferences.
DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.3. Average DC fast power: 151 kW.
The following operators run public charging in Ann Arbor, ranked by number of locations.
A selection of higher-power public charging locations across Ann Arbor, sorted by power level.
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Ann Arbor specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 21 DC fast and 110 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.