Install EV Chargers in Ann Arbor, Michigan

Install EV chargers or analyze a site in Ann Arbor, Michigan. 131 existing public charging locations (21 DC fast, 110 Level 2). Free 0–100 profitability score on any Ann Arbor address from EV Data Map by Charge Rigs.

Ann Arbor, Michigan is served by 131 public electric vehicle charging locations operating 300 individual chargers — an average of 2.3 chargers per site. Of those locations, 21 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 110 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ann Arbor is ChargePoint Network with 110 locations, followed by RED_E with 4. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ann Arbor and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ann Arbor

In Ann Arbor, Michigan, the public charging landscape is shaped significantly by ChargePoint Network, which operates a dominant 84% of the city's 131 charging locations. The city's offering includes a robust fleet of 21 DC fast charging stations, averaging an impressive 150 kW, with 43% classified as 150 kW or higher, positioning them well against competitors. This concentration in both operator and power capacity creates a unique advantage for new entrants targeting high-demand locations. With around 60 DC fast ports throughout the area, site developers will want to consider the potential for servicing longer-dwell charging needs, as well as the competitive dynamics at play in this market, particularly given the modern power curve that influences driver preferences.

Ann Arbor charging by the numbers

Locations
131
Chargers
300
DC Fast locations
21
Level 2 locations
110

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.3. Average DC fast power: 151 kW.

Ann Arbor charging — local snapshot

Top operator share
ChargePoint Network runs 84% of public locations across 11 networks.
Average DC fast power
151 kW (fastest stall: 400 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 131 locations
Estimated DC ports
60 fast-charging ports city-wide

Charging networks in Ann Arbor

The following operators run public charging in Ann Arbor, ranked by number of locations.

Featured charging locations in Ann Arbor

A selection of higher-power public charging locations across Ann Arbor, sorted by power level.

  1. Gigahub, Briarwood Cir, Ann Arbor, MI — Ann Arbor, MI, 48108 (BP_PULSE · DC Fast · 400 kW)
  2. Target T0634 (Ann Arbor, MI) — Ann Arbor, MI, 48103 (Electrify America · DC Fast · 350 kW)
  3. FLEET SERVICES DCFC-STATION 3 — Ann Arbor, MI, 48104 (ChargePoint Network · DC Fast · 250 kW)
  4. FLEET SERVICES DCFC-STATION 4 — Ann Arbor, MI, 48104 (ChargePoint Network · DC Fast · 250 kW)
  5. FLEET SERVICES DCFC-STATION 1 — Ann Arbor, MI, 48104 (ChargePoint Network · DC Fast · 205 kW)
  6. WASHTENAW BP 2 — Ann Arbor, MI, 48108 (ChargePoint Network · DC Fast · 205 kW)
  7. FLEET SERVICES DCFC-STATION 2 — Ann Arbor, MI, 48104 (ChargePoint Network · DC Fast · 205 kW)
  8. WASHTENAW BP 1 — Ann Arbor, MI, 48108 (ChargePoint Network · DC Fast · 205 kW)
  9. Meijer - Tesla Supercharger — Ann Arbor, MI, 48103 (Tesla · DC Fast · 150 kW)
  10. ELETRIC AVE VARSITY DC-3 — Ann Arbor, MI, 48103 (ChargePoint Network · DC Fast · 120 kW)
  11. ELETRIC AVE VARSITY DC-2 — Ann Arbor, MI, 48103 (ChargePoint Network · DC Fast · 120 kW)
  12. L401 L3-EVPARKMB-1 — Ann Arbor, MI, 48103 (ChargePoint Network · DC Fast · 102 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ann Arbor specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 21 DC fast and 110 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ann Arbor, Michigan?
There are 131 public electric vehicle charging locations in Ann Arbor, Michigan, with a combined 300 individual chargers. 21 locations offer DC fast charging and 110 provide Level 2 charging.
What is the largest EV charging network in Ann Arbor?
ChargePoint Network operates the most public charging locations in Ann Arbor with 110 sites, followed by RED_E with 4 sites.
How much does it cost to install an EV charger in Ann Arbor?
Level 2 EV chargers in Ann Arbor typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ann Arbor?
Most Ann Arbor projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ann Arbor?
A typical commercial Level 2 installation in Ann Arbor energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ann Arbor take to become profitable?
Payback in Ann Arbor depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.