Install EV Chargers in Taylor, Michigan

Install EV chargers or analyze a site in Taylor, Michigan. 11 existing public charging locations (5 DC fast, 6 Level 2). Free 0–100 profitability score on any Taylor address from EV Data Map by Charge Rigs.

Taylor, Michigan is served by 11 public electric vehicle charging locations operating 44 individual chargers — an average of 4.0 chargers per site. Of those locations, 5 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Taylor is RED_E with 7 locations, followed by CHAEVI with 1. Average DC fast power across the city is approximately 188 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Taylor and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Taylor

Taylor, Michigan's public charging landscape is characterized by a significant reliance on the RED_E network, which operates 64% of the 11 charging locations. This high concentration can impact uptime and pricing strategies for new operators. With 45% of the public charging sites providing DC fast charging, averaging 188 kW with the fastest station reaching 480 kW, the area boasts a competitive edge in power offerings. Notably, 40% of these fast chargers are 150 kW-class or higher, making Taylor an attractive choice for drivers prioritizing rapid charging. The presence of diverse charging networks, alongside a notable count of 22 DC fast ports, highlights opportunities for site developers seeking to optimize against local demand and infrastructure gaps.

Taylor charging by the numbers

Locations
11
Chargers
44
DC Fast locations
5
Level 2 locations
6

DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 4.0. Average DC fast power: 188 kW.

Taylor charging — local snapshot

Top operator share
RED_E runs 64% of public locations across 5 networks.
Average DC fast power
188 kW (fastest stall: 480 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 11 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Taylor

The following operators run public charging in Taylor, ranked by number of locations.

Featured charging locations in Taylor

A selection of higher-power public charging locations across Taylor, sorted by power level.

  1. FastTrack Market Marathon — Taylor, MI, 48180 (RED_E · DC Fast · 480 kW)
  2. Meijer - Tesla Supercharger — Taylor, MI, 48180 (Tesla · DC Fast · 250 kW)
  3. Taylor Ford — Taylor, MI, 48180 (RED_E · DC Fast · 120 kW)
  4. G and R Machine Tool — Taylor, MI, 48180 (RED_E · DC Fast · 60 kW)
  5. Taylor Buick GMC — Taylor, MI, 48180 (CHAEVI · DC Fast · 30 kW)
  6. Taylor Subway — Taylor, MI, 48180 (RED_E · Level 2 · 12 kW)
  7. Sunoco Gas Station Taylor — Taylor, MI, 48180 (RED_E · Level 2 · 11.5 kW)
  8. Voran Funeral Home Taylor — Taylor, MI, 48180 (RED_E · Level 2 · 9.6 kW)
  9. Moran Buick GMC Taylor — Taylor, MI, 48180 (RED_E · Level 2 · 9.6 kW)
  10. Beaumont — Taylor, MI, 48009 (CHARGELAB · Level 2 · 9.6 kW)
  11. Home2 Suites by Hilton - Taylor — Taylor, MI, 48180 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Taylor specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Taylor, Michigan?
There are 11 public electric vehicle charging locations in Taylor, Michigan, with a combined 44 individual chargers. 5 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Taylor?
RED_E operates the most public charging locations in Taylor with 7 sites, followed by CHAEVI with 1 sites.
How much does it cost to install an EV charger in Taylor?
Level 2 EV chargers in Taylor typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Taylor?
Most Taylor projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Taylor?
A typical commercial Level 2 installation in Taylor energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Taylor take to become profitable?
Payback in Taylor depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.