Install EV Chargers in Dearborn, Michigan

Install EV chargers or analyze a site in Dearborn, Michigan. 23 existing public charging locations (7 DC fast, 16 Level 2). Free 0–100 profitability score on any Dearborn address from EV Data Map by Charge Rigs.

Dearborn, Michigan is served by 23 public electric vehicle charging locations operating 66 individual chargers — an average of 2.9 chargers per site. Of those locations, 7 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Dearborn is RED_E with 11 locations, followed by Non-Networked with 8. Average DC fast power across the city is approximately 171 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dearborn and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Dearborn

Dearborn, Michigan, offers a balanced EV charging landscape with 23 public locations, featuring a robust mix of 30% DC fast chargers and 70% Level 2 options. Led by the prominent RED_E network, which controls nearly half of the sites, the city showcases a significant commitment to high-power charging, with an impressive average output of 171 kW at the DC fast locations—71% of which are rated at 150 kW or higher. This establishment of modern charging infrastructure caters not only to current demand but also positions Dearborn favorably for future EV growth, making it a strategic choice for developers seeking to invest in high-performance charging solutions within a supportive local framework.

Dearborn charging by the numbers

Locations
23
Chargers
66
DC Fast locations
7
Level 2 locations
16

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 2.9. Average DC fast power: 171 kW.

Dearborn charging — local snapshot

Top operator share
RED_E runs 48% of public locations across 4 networks.
Average DC fast power
171 kW (fastest stall: 240 kW)
High-power share
71% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 23 locations
Estimated DC ports
21 fast-charging ports city-wide

Charging networks in Dearborn

The following operators run public charging in Dearborn, ranked by number of locations.

Featured charging locations in Dearborn

A selection of higher-power public charging locations across Dearborn, sorted by power level.

  1. J Mart Ford and Wyoming — Dearborn, MI, 48126 (RED_E · DC Fast · 240 kW)
  2. Chillbox 9028 Michigan and Telegraph — Dearborn, MI, 48124 (RED_E · DC Fast · 240 kW)
  3. Bint Jebail Cultural Center — Dearborn, MI, 48126 (RED_E · DC Fast · 240 kW)
  4. Mission Ford of Dearborn — Dearborn, MI, 48162 (RED_E · DC Fast · 180 kW)
  5. Village Ford — Dearborn, MI, 48124 (RED_E · DC Fast · 180 kW)
  6. Rhombus Energy Solutions — Dearborn, MI, 48120 (Non-Networked · DC Fast · 60 kW)
  7. BBB Industries — Dearborn, MI, 48120 (Non-Networked · DC Fast · 60 kW)
  8. 22275 Garrison Street - Municipal Parking Lot A — Dearborn, MI, 48124 (EV Connect · Level 2 · 19 kW)
  9. 22051 Cherry Hill Street - Ford Field Park — Dearborn, MI, 48124 (EV Connect · Level 2 · 19 kW)
  10. City of Dearborn-Ford Performing Arts Center (FPAC) — Dearborn, MI, 48126 (EV Connect · Level 2 · 19 kW)
  11. Dearborn Town Center Office — Dearborn, MI, 48126 (RED_E · Level 2 · 12 kW)
  12. IB Lighting and Plumbing — Dearborn, MI, 48126 (RED_E · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Dearborn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Dearborn, Michigan?
There are 23 public electric vehicle charging locations in Dearborn, Michigan, with a combined 66 individual chargers. 7 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Dearborn?
RED_E operates the most public charging locations in Dearborn with 11 sites, followed by Non-Networked with 8 sites.
How much does it cost to install an EV charger in Dearborn?
Level 2 EV chargers in Dearborn typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Dearborn?
Most Dearborn projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Dearborn?
A typical commercial Level 2 installation in Dearborn energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Dearborn take to become profitable?
Payback in Dearborn depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.