Install EV chargers or analyze a site in Dearborn, Michigan. 23 existing public charging locations (7 DC fast, 16 Level 2). Free 0–100 profitability score on any Dearborn address from EV Data Map by Charge Rigs.
Dearborn, Michigan is served by 23 public electric vehicle charging locations operating 66 individual chargers — an average of 2.9 chargers per site. Of those locations, 7 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Dearborn is RED_E with 11 locations, followed by Non-Networked with 8. Average DC fast power across the city is approximately 171 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dearborn and receive an instant ROI score, demand projection, and recommended charger configuration.
Dearborn, Michigan, stands out with its balanced approach to EV charging infrastructure, featuring 23 public locations across four distinct networks led by RED_E, which operates nearly half of the sites. With 30% of these charging points classified as DC fast chargers, and an impressive average power output of 171 kW—along with the fastest stall reaching 240 kW—drivers have access to high-performance charging options. Notably, 71% of the DC fast sites offer 150 kW-class or higher, making Dearborn's charging amenities modern by national standards. This mix of fast and Level 2 charging caters effectively to varying driver needs, allowing for strategic development opportunities as the EV market continues to evolve.
DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 2.9. Average DC fast power: 171 kW.
The following operators run public charging in Dearborn, ranked by number of locations.
A selection of higher-power public charging locations across Dearborn, sorted by power level.
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Dearborn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.