Install EV Chargers in Duluth, Minnesota

Install EV chargers or analyze a site in Duluth, Minnesota. 19 existing public charging locations (7 DC fast, 12 Level 2). Free 0–100 profitability score on any Duluth address from EV Data Map by Charge Rigs.

Duluth, Minnesota is served by 19 public electric vehicle charging locations operating 57 individual chargers — an average of 3.0 chargers per site. Of those locations, 7 (37%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (63%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Duluth is ZEFNET with 9 locations, followed by ChargePoint Network with 5. Average DC fast power across the city is approximately 135 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Duluth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Duluth

Duluth boasts a competitive public charging landscape, featuring 19 locations spread across seven distinct operators, including a dominant presence from ZEFNET. This variety ensures better pricing and availability, enticing drivers to evaluate their options based on power and amenities rather than brand loyalty. With 37% of charging sites offering DC fast capabilities and an average output of 135 kW, the infrastructure supports mid-range power needs effectively, while 57% of these fast stations exceed 150 kW, catering to high-demand scenarios. The city is well-positioned for new entrants harnessing 150-350 kW technology to appeal to discerning EV drivers, thanks to the strategic mix of fast and Level 2 chargers that address diverse charging habits.

Duluth charging by the numbers

Locations
19
Chargers
57
DC Fast locations
7
Level 2 locations
12

DC fast share: 37% of locations. Level 2 share: 63%. Average chargers per site: 3.0. Average DC fast power: 135 kW.

Duluth charging — local snapshot

Top operator share
ZEFNET runs 47% of public locations across 7 networks.
Average DC fast power
135 kW (fastest stall: 350 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
37% DC fast / 63% Level 2 across 19 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Duluth

The following operators run public charging in Duluth, ranked by number of locations.

Featured charging locations in Duluth

A selection of higher-power public charging locations across Duluth, sorted by power level.

  1. Menards Duluth 3074 (Duluth, MN) — Duluth, MN, 55807 (Electrify America · DC Fast · 350 kW)
  2. Minnesota Power Endion Station — Duluth, MN, 55802 (ZEFNET · DC Fast · 240 kW)
  3. Endion Station — Duluth, MN, 55802 (ZEFNET · DC Fast · 160 kW)
  4. The Holiday Inn - Tesla Supercharger — Duluth, MN, 55802 (Tesla · DC Fast · 150 kW)
  5. Duluth Miller Hill Super One — Duluth, MN, 55811 (ZEFNET · DC Fast · 15.9 kW)
  6. Super One — Duluth, MN, 55811 (ZEFNET · DC Fast · 15.9 kW)
  7. Duluth Wild State Cider — Duluth, MN, 55806 (ZEFNET · DC Fast · 15.8 kW)
  8. Towne Place Suites — Duluth, MN, 55811 (TURNONGREEN · Level 2 · 11 kW)
  9. City of Duluth Depot Lot Charger #1 — Duluth, MN, 55802 (ZEFNET · Level 2 · 9.5 kW)
  10. Korner Store — Duluth, MN, 55808 (ZEFNET · Level 2 · 8.6 kW)
  11. City of Duluth Medical District Ramp #1 — Duluth, MN, 55805 (ZEFNET · Level 2 · 8.2 kW)
  12. Continental Ski and Bike — Duluth, MN, 55805 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Duluth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Duluth, Minnesota?
There are 19 public electric vehicle charging locations in Duluth, Minnesota, with a combined 57 individual chargers. 7 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Duluth?
ZEFNET operates the most public charging locations in Duluth with 9 sites, followed by ChargePoint Network with 5 sites.
How much does it cost to install an EV charger in Duluth?
Level 2 EV chargers in Duluth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Duluth?
Most Duluth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Duluth?
A typical commercial Level 2 installation in Duluth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Duluth take to become profitable?
Payback in Duluth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage