Install EV Chargers in New Brighton, Minnesota

Install EV chargers or analyze a site in New Brighton, Minnesota. 12 existing public charging locations (10 DC fast, 2 Level 2). Free 0–100 profitability score on any New Brighton address from EV Data Map by Charge Rigs.

New Brighton, Minnesota is served by 12 public electric vehicle charging locations operating 59 individual chargers — an average of 4.9 chargers per site. Of those locations, 10 (83%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 2 (17%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in New Brighton is DIRT_ROAD with 9 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 55 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in New Brighton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in New Brighton

New Brighton, Minnesota's public EV charging landscape is notably dominated by a single operator, DIRT_ROAD, which controls 75% of the 12 locations. This concentration impacts the overall reliability and pricing for users, making it essential for new site developers to consider competitive advantages. With 83% of the infrastructure comprising DC fast chargers, the city offers an average power output of 55 kW, though 20% of these fast sites provide a robust 150 kW or higher, catching the attention of EV drivers using navigation apps. Given this mix, new entrants using 150-350 kW charging equipment would elevate the local offerings, strategically positioning them to attract more users within the growing New Brighton EV market.

New Brighton charging by the numbers

Locations
12
Chargers
59
DC Fast locations
10
Level 2 locations
2

DC fast share: 83% of locations. Level 2 share: 17%. Average chargers per site: 4.9. Average DC fast power: 55 kW.

New Brighton charging — local snapshot

Top operator share
DIRT_ROAD runs 75% of public locations across 3 networks.
Average DC fast power
55 kW (fastest stall: 180 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
83% DC fast / 17% Level 2 across 12 locations
Estimated DC ports
25 fast-charging ports city-wide

Charging networks in New Brighton

The following operators run public charging in New Brighton, ranked by number of locations.

Featured charging locations in New Brighton

A selection of higher-power public charging locations across New Brighton, sorted by power level.

  1. New Brighton Ford - DCFC — New Brighton, MN, 55112 (Blink Network · DC Fast · 180 kW)
  2. Community Center — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 180 kW)
  3. Freedom Park — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  4. Innsbruck Park — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  5. Hansen Park (West Lot) — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  6. Sunny Square Park — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  7. Brightwood Hills Golf Course — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  8. City Hall — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  9. Public Safety — New Brighton, MN, 55122 (DIRT_ROAD · DC Fast · 24 kW)
  10. Driftwood Park — New Brighton, MN, 55112 (DIRT_ROAD · DC Fast · 24 kW)
  11. New Brighton Ford — New Brighton, MN, 55112 (Blink Network · Level 2 · 19.2 kW)
  12. Homewood Suites by Hilton Minneapolis-New Brighton - Tesla Destination — New Brighton, MN, 55415 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For New Brighton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 2 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in New Brighton, Minnesota?
There are 12 public electric vehicle charging locations in New Brighton, Minnesota, with a combined 59 individual chargers. 10 locations offer DC fast charging and 2 provide Level 2 charging.
What is the largest EV charging network in New Brighton?
DIRT_ROAD operates the most public charging locations in New Brighton with 9 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in New Brighton?
Level 2 EV chargers in New Brighton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in New Brighton?
Most New Brighton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in New Brighton?
A typical commercial Level 2 installation in New Brighton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in New Brighton take to become profitable?
Payback in New Brighton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.