Install EV Chargers in Prineville, Oregon

Install EV chargers or analyze a site in Prineville, Oregon. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Prineville address from EV Data Map by Charge Rigs.

Prineville, Oregon is served by 11 public electric vehicle charging locations operating 21 individual chargers — an average of 1.9 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Prineville is ChargePoint Network with 6 locations, followed by FLO with 3. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Prineville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Prineville

Prineville, Oregon, stands out with its balanced mix of 11 public charging stations, featuring both DC fast and Level 2 options. While only 18% of these locations are DC fast chargers, the average output remains at 50 kW, which may fall short compared to newer, higher-capacity offerings. This creates a notable opportunity for site developers to enhance the charging infrastructure and attract EV drivers who prioritize speed. With ChargePoint Network dominating the landscape at 55%, Prineville has a competitive yet diverse operator environment that can facilitate collaboration and innovation. As regional traffic patterns evolve alongside EV adoption, Prineville’s charging infrastructure can strategically position itself to better serve the growing demand.

Prineville charging by the numbers

Locations
11
Chargers
21
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 1.9. Average DC fast power: 50 kW.

Prineville charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 3 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
3 fast-charging ports city-wide

Charging networks in Prineville

The following operators run public charging in Prineville, ranked by number of locations.

Featured charging locations in Prineville

A selection of higher-power public charging locations across Prineville, sorted by power level.

  1. Power Up, Food Carts and Coffee - Fast Charger — Prineville, OR, 97754 (FLO · DC Fast · 50 kW)
  2. Stryker Park — Prineville, OR, 97754 (FLO · DC Fast · 50 kW)
  3. Prineville Reservoir State Park — Prineville, OR, 97754 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  4. Crook County Parks & Rec - Numad Adventure Rentals — Prineville, OR, 97754 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  5. CROOKCOUNTY JUSTICE CNTR #4 — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CROOKCOUNTY FAIRGROUNDS — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  7. COCC PRINEVILLE — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CROOKCOUNTY JUSTICE CNTR 3 — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CROOKCOUNTY JUSTICE CNTR #2 — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CROOKCOUNTY JUSTICE CNTR #1 — Prineville, OR, 97754 (ChargePoint Network · Level 2 · 6.5 kW)
  11. Coffeyville — Prineville, OR, 97754 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Prineville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Prineville, Oregon?
There are 11 public electric vehicle charging locations in Prineville, Oregon, with a combined 21 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Prineville?
ChargePoint Network operates the most public charging locations in Prineville with 6 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in Prineville?
Level 2 EV chargers in Prineville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Prineville?
Most Prineville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Prineville?
A typical commercial Level 2 installation in Prineville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Prineville take to become profitable?
Payback in Prineville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage