Install EV chargers or analyze a site in College Station, Texas. 20 existing public charging locations (9 DC fast, 11 Level 2). Free 0–100 profitability score on any College Station address from EV Data Map by Charge Rigs.
College Station, Texas is served by 20 public electric vehicle charging locations operating 61 individual chargers — an average of 3.0 chargers per site. Of those locations, 9 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in College Station is ChargePoint Network with 8 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 188 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in College Station and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in College Station
College Station boasts a dynamic EV charging landscape, featuring 20 public locations with a notable blend of operators, led by ChargePoint Network at 40% of the sites. With 45% of these locations offering DC fast charging, the average power output of 188 kW—and a maximum of 350 kW—positions the city as a leader in fast-charging infrastructure. The high concentration of 150 kW-class chargers makes it particularly appealing for drivers who prioritize speed and efficiency. This competitive market, enriched by eight distinct networks, encourages users to consider charging options based on power and amenities, enhancing satisfaction and supporting diverse EV needs in the region.
College Station charging by the numbers
Locations
20
Chargers
61
DC Fast locations
9
Level 2 locations
11
DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 3.0. Average DC fast power: 188 kW.
College Station charging — local snapshot
Top operator share
ChargePoint Network runs 40% of public locations across 8 networks.
Average DC fast power
188 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 20 locations
Estimated DC ports
40 fast-charging ports city-wide
Charging networks in College Station
The following operators run public charging in College Station, ranked by number of locations.
ChargePoint Network — 8 locations
Tesla Destination — 3 locations
EV Connect — 2 locations
Tesla — 2 locations
UNIVERSAL — 2 locations
Blink Network — 1 location
Non-Networked — 1 location
Electrify America — 1 location
Featured charging locations in College Station
A selection of higher-power public charging locations across College Station, sorted by power level.
Target T0800 (College Station, TX) — College Station, TX, 77840 (Electrify America · DC Fast · 350 kW)
H-E-B - Tesla Supercharger — College Station, TX, 77840 (Tesla · DC Fast · 250 kW)
TXB #75 STATION 1 — College Station, TX, 77845 (ChargePoint Network · DC Fast · 250 kW)
CS FORD CS FORD 5 — College Station, TX, 77845 (ChargePoint Network · DC Fast · 200 kW)
CS FORD CS FORD 4 — College Station, TX, 77845 (ChargePoint Network · DC Fast · 200 kW)
Cooper's Old Time Pit Bar-B-Que - Tesla Supercharger — College Station, TX, 77845 (Tesla · DC Fast · 150 kW)
TXB #75 STATION 2 — College Station, TX, 77845 (ChargePoint Network · DC Fast · 125 kW)
Texas A&M Lot 47 — College Station, TX, 77840 (Non-Networked · DC Fast · 120 kW)
Brookshire Bros #12 — College Station, TX, 77840 (EV Connect · DC Fast · 50 kW)
CarMax - College Stations — College Station, TX, 77845 (Blink Network · Level 2 · 21.6 kW)
CS FORD CS FORD 1 — College Station, TX, 77845 (ChargePoint Network · Level 2 · 19.2 kW)
Hampton Inn College Station — College Station, TX, 77840 (UNIVERSAL · Level 2 · 11.2 kW)
Nearby cities with EV charging coverage
Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For College Station specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in College Station, Texas?
There are 20 public electric vehicle charging locations in College Station, Texas, with a combined 61 individual chargers. 9 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in College Station?
ChargePoint Network operates the most public charging locations in College Station with 8 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in College Station?
Level 2 EV chargers in College Station typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in College Station?
Most College Station projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in College Station?
A typical commercial Level 2 installation in College Station energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in College Station take to become profitable?
Payback in College Station depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.