Install EV Chargers in Park City, Utah

Install EV chargers or analyze a site in Park City, Utah. 40 existing public charging locations (3 DC fast, 37 Level 2). Free 0–100 profitability score on any Park City address from EV Data Map by Charge Rigs.

Park City, Utah is served by 40 public electric vehicle charging locations operating 192 individual chargers — an average of 4.8 chargers per site. Of those locations, 3 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 37 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Park City is Non-Networked with 13 locations, followed by ChargePoint Network with 11. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Park City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Park City

Park City's EV charging infrastructure stands out with its strategic blend of ultra-fast DC charging and a diverse operator landscape, featuring nine distinct networks across 40 public locations. The three DC fast sites, averaging 300 kW and reaching up to 350 kW, provide high-capacity options essential for efficiently serving both residents and visitors. This robust offering includes a complete range of 150 kW-class chargers, ensuring that drivers can easily find powerful charging solutions tailored to their needs. Meanwhile, the significant presence of the Non-Networked operator at 33% of sites fosters competitive pricing and performance, compelling drivers to choose charging options based on power and amenities rather than brand loyalty. This nuanced market creates an evolving opportunity for site developers to strategically address gaps in the rapidly growing EV ecosystem.

Park City charging by the numbers

Locations
40
Chargers
192
DC Fast locations
3
Level 2 locations
37

DC fast share: 8% of locations. Level 2 share: 93%. Average chargers per site: 4.8. Average DC fast power: 300 kW.

Park City charging — local snapshot

Top operator share
Non-Networked runs 33% of public locations across 9 networks.
Average DC fast power
300 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 40 locations
Estimated DC ports
36 fast-charging ports city-wide

Charging networks in Park City

The following operators run public charging in Park City, ranked by number of locations.

Featured charging locations in Park City

A selection of higher-power public charging locations across Park City, sorted by power level.

  1. RMP Kimball Junction (Park City, UT) — Park City, UT, 84098 (Electrify America · DC Fast · 350 kW)
  2. Park City, UT — Park City, UT, 84060 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Park City Shopping Center - Tesla Supercharger — Park City, UT, 84098 (Tesla · DC Fast · 250 kW)
  4. Utah Olympic Park — Park City, UT, 84098 (ENVIROSPARK · Level 2 · 11.1 kW)
  5. Nicklaus Golf Course — Park City, UT, 84098 (Blink Network · Level 2 · 10.4 kW)
  6. AC Hotel by Marriott Park City — Park City, UT, 84098 (Blink Network · Level 2 · 10.4 kW)
  7. Park City Peaks — Park City, UT, 84060 (CHARGELAB · Level 2 · 7.7 kW)
  8. Silver Baron Lodge - Tesla Destination — Park City, UT, 84060 (Tesla Destination · Level 2 · 7.2 kW)
  9. Ecker Hill - Park and Ride Lot — Park City, UT, 84098 (Non-Networked · Level 2 · 7.2 kW)
  10. Montage Deer Valley - Tesla Destination — Park City, UT, 84060 (Tesla Destination · Level 2 · 7.2 kW)
  11. The St. Regis Deer Valley - Tesla Destination — Park City, UT, 84060 (Tesla Destination · Level 2 · 7.2 kW)
  12. Ice Arena — Park City, UT, 84060 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Park City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 37 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Park City, Utah?
There are 40 public electric vehicle charging locations in Park City, Utah, with a combined 192 individual chargers. 3 locations offer DC fast charging and 37 provide Level 2 charging.
What is the largest EV charging network in Park City?
Non-Networked operates the most public charging locations in Park City with 13 sites, followed by ChargePoint Network with 11 sites.
How much does it cost to install an EV charger in Park City?
Level 2 EV chargers in Park City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Park City?
Most Park City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Utah state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Park City?
A typical commercial Level 2 installation in Park City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Park City take to become profitable?
Payback in Park City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage