Install EV Chargers in South Jordan, Utah

Install EV chargers or analyze a site in South Jordan, Utah. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any South Jordan address from EV Data Map by Charge Rigs.

South Jordan, Utah is served by 11 public electric vehicle charging locations operating 36 individual chargers — an average of 3.3 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in South Jordan is ChargePoint Network with 8 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 113 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in South Jordan and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in South Jordan

South Jordan, Utah, features a concentrated EV charging network primarily dominated by ChargePoint, which operates 73% of the city's 11 public charging sites, influencing both reliability and pricing. With 27% of these locations offering DC fast charging, the average power output of 113 kW positions South Jordan's infrastructure as relatively mid-tier compared to national standards. Notably, one site reaches an impressive 250 kW, and a third of the DC fast chargers are 150 kW-class or above, appealing to drivers seeking quicker options. This mix of fast and Level 2 charging opportunities establishes a strategic landscape for potential new entrants aiming to capture demand in a city with clear growth potential.

South Jordan charging by the numbers

Locations
11
Chargers
36
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.3. Average DC fast power: 113 kW.

South Jordan charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 4 networks.
Average DC fast power
113 kW (fastest stall: 250 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in South Jordan

The following operators run public charging in South Jordan, ranked by number of locations.

Featured charging locations in South Jordan

A selection of higher-power public charging locations across South Jordan, sorted by power level.

  1. Carr Woodall - Tesla Supercharger — South Jordan, UT, 84095 (Tesla · DC Fast · 250 kW)
  2. Tim Dahle Nissan Southtowne — South Jordan, UT, 84095 (Non-Networked · DC Fast · 50 kW)
  3. RIVERTON CHEVY STATION 1 — South Jordan, UT, 84095 (ChargePoint Network · DC Fast · 40 kW)
  4. Holiday Inn South Jordan - SLC South - Tesla Destination — South Jordan, UT, 84095 (Tesla Destination · Level 2 · 7.2 kW)
  5. CITY HALL SOUTH JORDAN 2 — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CITY HALL CITY HALL 3 — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  7. STH JORDAN ADMN JORDAN CU — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  8. SCO S_JOR_HOMECARE1 — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITY HALL PW PUB — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY HALL SOUTH JORDAN 1 — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY HALL STATION 64 — South Jordan, UT, 84095 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For South Jordan specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in South Jordan, Utah?
There are 11 public electric vehicle charging locations in South Jordan, Utah, with a combined 36 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in South Jordan?
ChargePoint Network operates the most public charging locations in South Jordan with 8 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in South Jordan?
Level 2 EV chargers in South Jordan typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in South Jordan?
Most South Jordan projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Utah state, utility and NEVI-funded programs.
How long does it take to install an EV charger in South Jordan?
A typical commercial Level 2 installation in South Jordan energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in South Jordan take to become profitable?
Payback in South Jordan depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage