Install EV Chargers in Montpelier, Vermont

Install EV chargers or analyze a site in Montpelier, Vermont. 25 existing public charging locations (5 DC fast, 20 Level 2). Free 0–100 profitability score on any Montpelier address from EV Data Map by Charge Rigs.

Montpelier, Vermont is served by 25 public electric vehicle charging locations operating 54 individual chargers — an average of 2.2 chargers per site. Of those locations, 5 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Montpelier is ChargePoint Network with 13 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 176 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Montpelier and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Montpelier

Montpelier boasts a dynamic EV charging landscape, featuring 25 public locations supported by six distinct operators, with ChargePoint Network dominating at 52% of the sites. The city’s 5 DC fast charging stations are particularly notable, averaging an impressive 176 kW and showcasing a significant portion—40%—that are 150 kW-class or higher. This diverse offering empowers drivers to make informed choices based on charging speed and available amenities, rather than relying on a single brand. With roughly 12 DC fast ports distributed throughout Montpelier, the strategic blend of high-power options and Level 2 chargers positions the city well for evolving EV demands, while the available data can help identify growth opportunities in the local market.

Montpelier charging by the numbers

Locations
25
Chargers
54
DC Fast locations
5
Level 2 locations
20

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 2.2. Average DC fast power: 176 kW.

Montpelier charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 6 networks.
Average DC fast power
176 kW (fastest stall: 480 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 25 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Montpelier

The following operators run public charging in Montpelier, ranked by number of locations.

Featured charging locations in Montpelier

A selection of higher-power public charging locations across Montpelier, sorted by power level.

  1. Green Mountain Power - Montpelier — Montpelier, VT, 05602 (FLO · DC Fast · 480 kW)
  2. 265 River St — Montpelier, VT, 05602 (EV Connect · DC Fast · 180 kW)
  3. McGee Hyundai of Barre — Montpelier, VT, 5602 (Blink Network · DC Fast · 120 kW)
  4. Cody Chevrolet-Cadillac — MONTPELIER, VT, 05602 (EV Connect · DC Fast · 50 kW)
  5. EastRise Credit Union — Montpelier, VT, 05602 (VIALYNK · DC Fast · 50 kW)
  6. VSECU Montpelier — Montpelier, VT, 5602 (Blink Network · Level 2 · 7.2 kW)
  7. 25 Liberty — Montpelier, VT, 05602 (FLO · Level 2 · 7.2 kW)
  8. 191 State St — Montpelier, VT, 05602 (FLO · Level 2 · 7.2 kW)
  9. Capitol Plaza Hotel Montpelier — Montpelier, VT, 05602 (EV Connect · Level 2 · 7.2 kW)
  10. GMP City of Montpelier — Montpelier, VT, 5602 (Blink Network · Level 2 · 7.2 kW)
  11. Hunger Mountain Co-op — Montpelier, VT, 05602 (Non-Networked · Level 2 · 7.2 kW)
  12. Formula Ford — Montpelier, VT, 05602 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Vermont we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Montpelier specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Montpelier, Vermont?
There are 25 public electric vehicle charging locations in Montpelier, Vermont, with a combined 54 individual chargers. 5 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Montpelier?
ChargePoint Network operates the most public charging locations in Montpelier with 13 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Montpelier?
Level 2 EV chargers in Montpelier typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Montpelier?
Most Montpelier projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Vermont state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Montpelier?
A typical commercial Level 2 installation in Montpelier energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Montpelier take to become profitable?
Payback in Montpelier depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage