Install EV chargers or analyze a site in South Burlington, Vermont. 37 existing public charging locations (6 DC fast, 30 Level 2). Free 0–100 profitability score on any South Burlington address from EV Data Map by Charge Rigs.
South Burlington, Vermont is served by 37 public electric vehicle charging locations operating 107 individual chargers — an average of 2.9 chargers per site. Of those locations, 6 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 30 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in South Burlington is ChargePoint Network with 22 locations, followed by Non-Networked with 7. Average DC fast power across the city is approximately 100 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in South Burlington and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in South Burlington
South Burlington boasts a robust public charging infrastructure with a diverse mix of 37 locations serviced by eight distinct operators, making it a competitive market for EV drivers. ChargePoint Network leads with 59% of the sites, ensuring a variety of pricing and availability. The city features six DC fast charging stations averaging 100 kW, including a notable fast stall at 150 kW, with 17% of these locations at the higher power range. This encourages drivers to choose charging options based on power and amenities rather than brand loyalty, positioning South Burlington as a strategic stop in the regional charging landscape. The combination of Level 2 and DC fast options caters effectively to both short and long dwell-time needs, further enhancing its appeal.
South Burlington charging by the numbers
Locations
37
Chargers
107
DC Fast locations
6
Level 2 locations
30
DC fast share: 16% of locations. Level 2 share: 81%. Average chargers per site: 2.9. Average DC fast power: 100 kW.
South Burlington charging — local snapshot
Top operator share
ChargePoint Network runs 59% of public locations across 8 networks.
Average DC fast power
100 kW (fastest stall: 150 kW)
High-power share
17% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 37 locations
Estimated DC ports
17 fast-charging ports city-wide
Charging networks in South Burlington
The following operators run public charging in South Burlington, ranked by number of locations.
ChargePoint Network — 22 locations
Non-Networked — 7 locations
Blink Network — 2 locations
VIALYNK — 2 locations
Tesla — 1 location
FLO — 1 location
EV Connect — 1 location
Tesla Destination — 1 location
Featured charging locations in South Burlington
A selection of higher-power public charging locations across South Burlington, sorted by power level.
Healthy Living - Tesla Supercharger — South Burlington, VT, 05403 (Tesla · DC Fast · 150 kW)
SUNCOMMON FAST CHARGER 1 — South Burlington, VT, 05403 (ChargePoint Network · DC Fast · 125 kW)
SUNCOMMON FAST CHARGER 2 — South Burlington, VT, 05403 (ChargePoint Network · DC Fast · 125 kW)
Green Mountain Power - IDX Dr — South Burlington, VT, 05403 (FLO · DC Fast · 100 kW)
Key Motors of South Burlington — South Burlington, VT, 05403 (EV Connect · DC Fast · 50 kW)
South Burlington - KBTV — South Burlington, VT, 05403 (Non-Networked · DC Fast · 50 kW)
BEN & JERRY'S BEN & JERRY'S 2 — South Burlington, VT, 05403 (ChargePoint Network · Level 2 · 12 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For South Burlington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 30 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in South Burlington, Vermont?
There are 37 public electric vehicle charging locations in South Burlington, Vermont, with a combined 107 individual chargers. 6 locations offer DC fast charging and 30 provide Level 2 charging.
What is the largest EV charging network in South Burlington?
ChargePoint Network operates the most public charging locations in South Burlington with 22 sites, followed by Non-Networked with 7 sites.
How much does it cost to install an EV charger in South Burlington?
Level 2 EV chargers in South Burlington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in South Burlington?
Most South Burlington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Vermont state, utility and NEVI-funded programs.
How long does it take to install an EV charger in South Burlington?
A typical commercial Level 2 installation in South Burlington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in South Burlington take to become profitable?
Payback in South Burlington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.