Install EV Chargers in Rutland, Vermont

Install EV chargers or analyze a site in Rutland, Vermont. 15 existing public charging locations (5 DC fast, 10 Level 2). Free 0–100 profitability score on any Rutland address from EV Data Map by Charge Rigs.

Rutland, Vermont is served by 15 public electric vehicle charging locations operating 34 individual chargers — an average of 2.3 chargers per site. Of those locations, 5 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Rutland is ChargePoint Network with 6 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 147 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Rutland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Rutland

Rutland boasts a competitive public charging landscape with 15 locations operated by 7 distinct networks, ensuring a diverse choice for EV drivers. ChargePoint Network leads with 40% of the sites, promoting competitive pricing and uptime. With 33% of these locations offering DC fast charging, the infrastructure caters to both short and longer dwell times, as evidenced by the average DC fast charging power of 147 kW, ascending to a peak of 250 kW at the fastest site. Notably, 40% of the DC fast outlets are in the 150 kW-class or higher, appealing to drivers seeking efficient recharging. This array of offerings enhances driver selection, especially when considering navigation apps that highlight charging power and amenities.

Rutland charging by the numbers

Locations
15
Chargers
34
DC Fast locations
5
Level 2 locations
10

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.3. Average DC fast power: 147 kW.

Rutland charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 7 networks.
Average DC fast power
147 kW (fastest stall: 250 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 15 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Rutland

The following operators run public charging in Rutland, ranked by number of locations.

Featured charging locations in Rutland

A selection of higher-power public charging locations across Rutland, sorted by power level.

  1. Stewart's Shops - Tesla Supercharger — Rutland, VT, 05701 (Tesla · DC Fast · 250 kW)
  2. GMP OH Rutland — Rutland, VT, 05701 (VIALYNK · DC Fast · 240 kW)
  3. Alderman Supercharger — Rutland, VT, 05701 (EV Connect · DC Fast · 120 kW)
  4. Rutland Plaza — Rutland, VT, 05701 (eVgo Network · DC Fast · 100 kW)
  5. Alderman’s Chevrolet — Rutland, VT, 05701 (Non-Networked · DC Fast · 25 kW)
  6. VERMONT BGS BGS RUTLAND F3 — Rutland, VT, 05701 (ChargePoint Network · Level 2 · 12 kW)
  7. VERMONT BGS BGS RUTLAND F4 — Rutland, VT, 05701 (ChargePoint Network · Level 2 · 12 kW)
  8. Audi Rutland — Rutland, VT, 05701 (Blink Network · Level 2 · 8.6 kW)
  9. Formula Ford Lincoln — Rutland, VT, 05701 (Non-Networked · Level 2 · 7.2 kW)
  10. Rutland Regional Medical Center — Rutland, VT, 05701 (Non-Networked · Level 2 · 7.2 kW)
  11. Hampton Inn Rutland — Rutland, VT, 5701 (Blink Network · Level 2 · 7.2 kW)
  12. LINCOLN PLACE STATION 1 — Rutland, VT, 05701 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Vermont we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Rutland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Rutland, Vermont?
There are 15 public electric vehicle charging locations in Rutland, Vermont, with a combined 34 individual chargers. 5 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Rutland?
ChargePoint Network operates the most public charging locations in Rutland with 6 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Rutland?
Level 2 EV chargers in Rutland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Rutland?
Most Rutland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Vermont state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Rutland?
A typical commercial Level 2 installation in Rutland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Rutland take to become profitable?
Payback in Rutland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage