Install EV chargers or analyze a site in Andover, Massachusetts. 28 existing public charging locations (0 DC fast, 28 Level 2). Free 0–100 profitability score on any Andover address from EV Data Map by Charge Rigs.
Andover, Massachusetts is served by 28 public electric vehicle charging locations operating 61 individual chargers — an average of 2.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Andover is ChargePoint Network with 25 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Andover and receive an instant ROI score, demand projection, and recommended charger configuration.
Andover, Massachusetts, presents a unique landscape for EV charging, with its 28 public charging locations entirely consisting of Level 2 stations, offering no DC fast charging options. This complete absence of fast chargers creates a significant gap for drivers in need of quick charging solutions, who may be compelled to travel to neighboring areas to meet their needs. The dominance of ChargePoint Network, which manages 89% of the city's charging sites, emphasizes a reliance on a single operator for network reliability and pricing, making it essential for potential developers to consider when planning competitive infrastructure. With the current EV charging ecosystem focused solely on longer-dwell options, opportunities abound for innovative charging solutions that cater to an underserved demand for fast charging in the region.
DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.2. Average DC fast power: 0 kW.
The following operators run public charging in Andover, ranked by number of locations.
A selection of higher-power public charging locations across Andover, sorted by power level.
Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Andover specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.