Install EV chargers or analyze a site in Andover, Massachusetts. 28 existing public charging locations (0 DC fast, 28 Level 2). Free 0–100 profitability score on any Andover address from EV Data Map by Charge Rigs.
Andover, Massachusetts is served by 28 public electric vehicle charging locations operating 61 individual chargers — an average of 2.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Andover is ChargePoint Network with 25 locations, followed by GREEN_BRIDGE with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Andover and receive an instant ROI score, demand projection, and recommended charger configuration.
Andover, Massachusetts, presents a unique landscape for EV charging, as it is entirely reliant on Level 2 charging with no DC fast options available, creating a clear opportunity for new site developers. With ChargePoint Network managing 89% of the city's 28 public charging locations, operators must consider this concentration when evaluating market entry, as it influences pricing and reliability for users. The absence of fast charging means that local drivers seeking quick recharges are currently forced to travel beyond city limits. This gap highlights the demand for additional DC fast stations, making Andover an attractive market for investment in fast charging solutions while also answering the specific needs of its EV community.
DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.2. Average DC fast power: 0 kW.
The following operators run public charging in Andover, ranked by number of locations.
A selection of higher-power public charging locations across Andover, sorted by power level.
Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Andover specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.